Renovate Mission Support Facility (B145) & Repair/Renovate Conference Room (LRSO), Alert Facility (B1085) Minot Air Force Base (MAFB), North Dakota

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

W071 ENDIST OMAHA

Contract Value

Not provided

Codes & Classification
Solicitation Number

W9128F27SM005

NAICS

236220 - Commercial and Institutional Building Construction

Classification Code

-

Additional Details
Set Aside

None

Place of Performance

Minot AFB, North Dakota, UNITED STATES

SourceSAM
Documents1
The U.S. Army Corps of Engineers (USACE), Omaha District, is conducting market research through a Sources Sought notice (W9128F27SM005) to identify qualified industry partners for a significant renovation and modernization effort at Minot Air Force Base (MAFB), North Dakota. This initiative, undertaken on behalf of the Department of the Air Force (5th Bomb Wing / Air Force Global Strike Command), encompasses two distinct but interrelated projects: the comprehensive renovation of the Mission Support Facility (Building 145) and the conversion of a conference room in the Alert Facility (Building 1085) into a high-security Special Access Facility (SAF) supporting the Long-Range Stand-Off (LRSO) mission. **Purpose, Scope, and Intended Outcomes** The primary objective of this procurement is to address critical infrastructure needs at Minot AFB by delivering modernized, mission-ready facilities that support both general mission support functions and highly secure, classified operations. The Mission Support Facility (B145) requires extensive interior, exterior, and systems upgrades to continue serving airmen, families, and retirees effectively. Simultaneously, the Alert Facility (B1085) conference room must be transformed into a state-of-the-art SAF/SCIF, fully compliant with Intelligence Community Directive (ICD) 705 standards, to enable secure, Top Secret-level operations. The government intends to execute these projects programmatically under a single Other Transaction Agreement (OTA), leveraging the Construction Manager at Risk (CM@Risk) delivery method. This approach is designed to foster innovation, accelerate delivery, and ensure cost certainty, with the selected contractor collaborating closely with the USACE in-house Design Team (serving as Designer of Record) to finalize designs and deliver construction within a Guaranteed Maximum Price (GMP). **Key Requirements, Objectives, and Expected Deliverables** *Project 1: Renovate Mission Support Facility (Building 145)* - Renovation of approximately 28,000 SF within a 45,236 SF facility to create a centralized hub for mission support. - Scope includes comprehensive demolition and hazardous material abatement, modernization of entry control vestibules, mechanical and plumbing upgrades, electrical system overhauls, and civil/site improvements (utilities, communications, parking, and paving). - All work must address ADA compliance, fire/life safety, and future flexibility for system changes. *Project 2: Convert Conference Room to Special Access Facility (SAF), Building 1085* - Renovation of approximately 2,660 SF on the second floor to establish an accredited SAF/SCIF with secure entry, briefing, and administrative spaces. - Requirements include selective demolition, hazardous abatement, installation of RF shielding and acoustical treatments, construction of a secure entry vestibule, raised access flooring, specialized standalone HVAC (with no roof penetrations), upgraded electrical and fire protection systems, and full integration of security infrastructure (IDS, CCTV, intercom). - All work must comply with DoD antiterrorism standards, Minot AFB exterior/roofing standards, and relevant cybersecurity requirements. **Acquisition Methodology and Contract Structure** - The procurement will utilize an OTA under 10 USC 2808a, not subject to the Federal Acquisition Regulation (FAR), providing flexibility in structuring terms and processes. - The CM@Risk model will be employed, with the contractor engaged during the final design phase (at approximately 95% design completion) to provide constructability input, value engineering, and market-based cost validation. - The contract will be executed in two phases: - *Phase 1 (Preconstruction Services):* The contractor collaborates with the USACE Design Team to finalize design, refine pricing, and establish the GMP. Compensation includes a fixed preconstruction services fee and a competitively bid target fee. - *Phase 2 (Construction Execution):* Upon agreement on the GMP, the contractor assumes risk for construction delivery, with the DOR retaining design liability but the contractor responsible for constructability, schedule, and trade coordination. **Contracting Entity and Contact Information** - Contracting Entity: W071 ENDIST OMAHA (USACE Omaha District), a federal office under the Department of the Army, Department of Defense. - Place of Performance: Minot Air Force Base, North Dakota, United States. - NAICS Code: 236220 (Commercial and Institutional Building Construction), 2022 version. - Estimated Construction Cost Limitation (CCL): $31,923,000 for Building 145; $3,503,000 for Building 1085. - Primary Contact: Phillip Wickham ([email protected]) - Secondary Contact: Jessica Beckman ([email protected]) - Notice URL: [SAM.gov Opportunity](https://sam.gov/opp/122d538999234fe0b7e9c9108209b9ef/view) **Procurement Type, Set-Aside, and Special Considerations** - This is a Sources Sought/Market Research notice; it is not a solicitation for proposals, bids, or qualifications at this stage. - The government welcomes responses from all qualified entities, regardless of business size or prior federal construction experience. - No set-aside is specified; the opportunity is open to all capable firms. - The procurement will be executed under OTA authority, allowing for innovative approaches and flexible terms not bound by the FAR. - The government will not reimburse costs associated with responding to this notice and will not accept proprietary information. **Submission Requirements and Evaluation** Interested firms are requested to submit a narrative (maximum 5 pages) addressing company information, bonding capacity, relevant experience (especially with DoD installations and mission-critical, semi-occupied facilities), and feedback on the proposed CM@Risk-OTA approach. Specific input is sought on industry best practices, anticipated market constraints, innovative technologies, compensation structures, and teaming strategies. Responses must be submitted via email to the designated contacts by 2:00 pm (MST) on December 11, 2026. **Constant Elements Over Contract Lifecycle** - The project will remain under the oversight of USACE Omaha District, with the government’s in-house design team as Designer of Record. - The CM@Risk/OTA framework, with its two-phase structure and GMP-based risk allocation, will govern the contractor’s role from preconstruction through completion. - Compliance with DoD, Air Force, and Intelligence Community standards (including ICD/ICS 705, UFC, and cybersecurity requirements) will be mandatory throughout. - The collaborative, open-book approach to pricing and risk management will be central to project execution. **Conclusion** This market research notice represents a significant opportunity for qualified contractors with experience in large-scale, secure facility renovations and collaborative delivery methods. The government seeks industry input to refine its acquisition strategy and ensure successful delivery of these mission-critical projects at Minot AFB. Interested firms should carefully review the requirements and respond with detailed capability statements and feedback to inform the government’s planning and future solicitation.