DESIGN-BID-BUILD (DBB) PHASE III GROUNDWATER TREATMENT PLANT CONSTRUCTION, NWIRP BETHPAGE, WANTAGH, NEW YORK

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

NAVFACSYSCOM MID-ATLANTIC

Contract Value

Not provided

Codes & Classification
Solicitation Number

N4008527R0048

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Classification Code

Y1NE

Additional Details
Set Aside

None

Place of Performance

Bethpage, New York, UNITED STATES

SourceSAM
The Department of the Navy, through the Naval Facilities Engineering Systems Command Mid-Atlantic (NAVFACSYSCOM MID-ATLANTIC), has issued a presolicitation notice for a significant Design-Bid-Build (DBB) construction project: Phase III Groundwater Treatment Plant Construction at the Naval Weapons Industrial Reserve Plant (NWIRP) Bethpage, located in Wantagh, New York. This initiative is a critical component of ongoing environmental remediation efforts to address a plume of contaminated groundwater that has migrated south from the former NWIRP and Northrop Grumman properties. The contamination, primarily involving chlorinated volatile organic compounds (VOCs) such as trichloroethylene (TCE) and 1,4-dioxane, is being remediated in accordance with requirements set forth by the U.S. Navy and the New York State Department of Environmental Conservation. The primary objective of this procurement is the complete construction and commissioning of a new Groundwater Treatment Plant (GWTP) designed to intercept and treat the leading edge of the contaminated groundwater plume. The facility will be engineered to process the recovered groundwater to meet drinking water standards, utilizing a treatment train that includes sand filtration, an Advanced Oxidation Process (AOP), and Granular Activated Carbon (GAC) filtration. The scope of work is comprehensive and includes the following key elements: - Construction and commissioning of three groundwater recovery wells, with associated underground piping to convey contaminated water to the treatment plant. - Erection of two new buildings: one to house the treatment plant and another for office functions, complete with all necessary structural, electrical, and plumbing infrastructure. - Installation of large storage tanks, including three reinforced plastic (FRP) vertical storage tanks and one glass-fused backwash waste steel tank. - Provision and installation of three multimedia vertical pressure filter (MMF) unit vessels, two horizontal cartridge filters, and an ozone-hydrogen peroxide AOP system. - Integration of three liquid phase granular activated carbon (LGAC) unit vessels. - Supply and installation of eight pumps with associated piping, valves, supports, and appurtenances, as well as two blowers. - Implementation of chemical feed systems for sodium hydroxide, sodium hypochlorite, and hydrogen peroxide. - Construction of all required foundations, interior and exterior concrete slabs, and under-slab utility coordination. - Completion of site work, including earthwork, pad excavation, site re-grading, site utilities, pavements, fencing, and a fire protection system. - Installation of a 1200A, 277/480V, 3-phase, 3-wire electrical service, a motor control center (MCC) for variable frequency drives (VFDs), and a comprehensive heating, ventilation, and air conditioning (HVAC) system. - Deployment of a programmable logic controller (PLC) and supervisory control and data acquisition (SCADA) system, with internet/cellular gateway for off-site monitoring of Phase III system process parameters. - Construction of one underground vault, and installation of all required piping, valves, fittings, wiring, instruments, and equipment within conduits, manholes, and vaults. The contract performance period is anticipated to be 1,095 calendar days (approximately three years) from the date of award. The estimated magnitude of construction for this project is between $25,000,000 and $100,000,000. This procurement will be conducted as an "Unrestricted" full and open competition, as market research and a sources sought process determined that there is not a reasonable expectation of receiving adequate competition from small business concerns. As such, there are no set-aside requirements for small businesses, though large business concerns will be required to submit a subcontracting plan prior to contract award. The selection process will follow the best value continuum, utilizing a tradeoff approach in accordance with FAR 15.103-1, and will require submission of both price and non-price (technical and past performance) proposals. Detailed evaluation criteria will be provided in the forthcoming solicitation. The applicable North American Industry Classification System (NAICS) code is 237110, Water and Sewer Line and Related Structures Construction, with a small business size standard of $45 million. The Product Service Code (PSC) is Y1NE. The anticipated release date for the Request for Proposal (RFP) is on or about December 3, 2026, with contract award expected in March 2027. All solicitation documents will be available in Adobe PDF format for download from the Procurement Integrated Enterprise Environment (PIEE) and SAM.gov websites. Contractors are strongly encouraged to register on these platforms to receive notifications of amendments and updates. The place of performance for this project is Bethpage, New York. All prospective offerors must be registered in the System for Award Management (SAM) to be eligible for award. For further information or to submit questions regarding this notice, interested parties may contact Shayna Eichner at [email protected] or 757-341-1046, or Kristy Gerrek at [email protected] or 757-341-0089. This presolicitation notice serves as an advance notification of the upcoming opportunity and does not constitute a request for proposal, quote, or invitation for bid. Contractors with demonstrated experience in large-scale water treatment plant construction and environmental remediation are encouraged to monitor the official solicitation for further details and submission requirements.