Market Intelligence Notice: Fort Hood Bldg 410 General Stilwell Army Reserve Center (ARC)

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

W072 ENDIST LOUISVILLE

Contract Value

Not provided

Codes & Classification
Solicitation Number

W912QR-PDB-FORTHOOD

NAICS

236220 - Commercial and Institutional Building Construction

Classification Code

-

Additional Details
Set Aside

None

Place of Performance

Fort Hood, Texas, UNITED STATES

SourceSAM
Documents1
The U.S. Army Corps of Engineers (USACE), Louisville District, has issued a Request for Information (RFI) and Market Intelligence Notice regarding the planned repair, restoration, and modernization of Building 410—the General Stilwell Army Reserve Center (ARC)—located at Fort Hood, Texas. This notice, identified under procurement number W912QR-PDB-FORTHOOD, is intended solely for market research and does not constitute a solicitation or request for proposal. Participation is voluntary, and no contract or agreement will result directly from this RFI. **Purpose and Scope** The primary objective of this procurement is to address significant facility deterioration and modernize Building 410, a two-story, 144,360 square foot command and control/training facility constructed in 1985. The building supports multiple Army Reserve units, including six Legal Detachments, a Training Brigade, Transportation Company, Civil Affairs Brigade, Human Resources Company Headquarters, a Public Affairs Detachment, and the Reserve Personnel Action Center. The project aims to extend the economic life of the facility by 25 years and ensure mission readiness for its occupants. The scope encompasses comprehensive design and construction services to deliver a fully functional, code-compliant, and modernized facility. This includes the replacement and upgrade of mechanical, plumbing, and electrical systems, rehabilitation of the building envelope (including roof replacement), hazardous materials abatement (asbestos and lead-based paint), and improvements to non-organizational vehicle parking and supporting utilities. The facility will also be brought into compliance with current Americans with Disabilities Act (ADA) standards, including the addition of an elevator and accessible bathrooms, and will address fire/life safety deficiencies such as the absence of a sprinkler system. **Key Requirements and Deliverables** - Full design and construction services, including construction management, supervision, quality control, and supply of all necessary materials and equipment. - Replacement of failing roof membrane, exterior doors, windows, and storefronts; rehabilitation of interior finishes. - Modernization of HVAC systems, including rooftop units, air handlers, boilers, pumps, piping, and controls. - Upgrades to electrical infrastructure, including main and distribution panels, wiring, and outlets to eliminate safety hazards and accommodate future loads. - Plumbing system upgrades to meet current codes, including replacement of fixtures, piping, and hot water heater. - Modernization of telecommunications infrastructure to comply with Army Reserve Network Enterprise Center (ARNEC), TIA-607, and UFC 3-580-01 standards. - Abatement and proper disposal of hazardous materials in accordance with applicable laws and regulations. - Upgrades to ensure ADA compliance and fire/life safety, including installation of a fire sprinkler system and accessible facilities. - Improvements to non-organizational vehicle parking and supporting utilities. **Acquisition Strategy and Special Considerations** The estimated acquisition magnitude for this project is $90,000,000. The USACE Louisville District is evaluating a Progressive Design Build (PDB) strategy utilizing an Other Transaction (OT) Agreement under the authority of 10 U.S.C. § 2808a. This approach is intended to facilitate testing and experimentation with new and emergent construction technologies, with the goal of enhancing mission resilience, improving installation support, and reducing costs and schedules. The PDB strategy involves a two-phase process: - **Phase 1 (Design & Pre-Construction):** Collaborative advancement of design, constructability reviews, open-book cost estimating, and risk mitigation between the Government and the selected OT Awardee. - **Phase 2 (Construction):** Upon reaching an agreed-upon design maturity (typically 60% to 90%), the Awardee will propose a Guaranteed Maximum Price (GMP). If accepted, construction proceeds; if not, the Government may pursue alternative completion methods. The RFI seeks industry feedback on capability, experience with OTA and collaborative delivery methods, technical expertise in large-scale facility modernization, risk identification and mitigation strategies, and recommendations for acquisition strategy and evaluation criteria. **Contracting Entity and Contact Information** - **Contracting Entity:** W072 ENDIST LOUISVILLE (U.S. Army Corps of Engineers, Louisville District) - **Department:** Department of Defense, Department of the Army - **Place of Performance:** Fort Hood, Texas, United States - **NAICS Code:** 236220 – Commercial and Institutional Building Construction (2022 version), Small Business Size Standard: $45 Million **Primary Contacts:** - Adyson Medley, Email: [email protected], Phone: 502-315-6211 - Richard Van De Linde, Email: [email protected] **Submission Instructions and Timeline** Interested firms are required to submit their responses exclusively via the designated online survey form (https://forms.osi.apps.mil/r/rU5Rsi9Qmg) by 20 November 2026 at 1000 Eastern Time. No other submission methods will be accepted. Firms are encouraged to join the Interested Vendors List on SAM.gov for future updates. **Additional Considerations** - This RFI is for market research only; no proprietary, classified, or protected information should be submitted. - All feedback will be treated as public market research to inform the Government’s acquisition approach. - The Government is particularly interested in candid industry input on commercial practices, risk sharing, project phasing, and evaluation criteria to ensure successful project execution under 10 U.S.C. § 2808a. This opportunity is well-suited for firms with demonstrated experience in large-scale military or institutional facility modernization, hazardous materials abatement, and collaborative delivery methods such as Progressive Design Build or Construction Management at Risk. Contractors should carefully review the requirements and consider their capacity to deliver comprehensive design-build solutions under an OTA framework. For further details and to access the full notice, visit: [SAM.gov Opportunity ID c3daacd708a04bca8f8519633fa5556c](https://sam.gov/opp/c3daacd708a04bca8f8519633fa5556c/view).