Request for Information (RFI)- Parallel Battery Relay

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

FA8692 HELICOPTER PGM AFLCMC WIH

Contract Value

Not provided

Codes & Classification
Solicitation Number

MH139-CR11

NAICS

-

Classification Code

-

Additional Details
Set Aside

None

Place of Performance

Wright Patterson AFB, Ohio, UNITED STATES

SourceSAM
The Department of the Air Force, through the Air Force Life Cycle Management Center (AFLCMC) MH-139A Program Office (AFLCMC/WIH), has issued a Request for Information (RFI) to conduct market research regarding a Parallel Battery Relay modification for the MH-139A helicopter. This notice, identified by procurement number MH139-CR11, is strictly for informational and market research purposes in accordance with FAR Part 10 and does not constitute a solicitation or a commitment to issue a future Request for Proposal (RFP). **Purpose and Scope** The primary objective of this RFI is to identify qualified sources capable of providing a modification that enables the MH-139A aircraft to parallel its main and auxiliary batteries during engine start sequences. This enhancement is critical for supporting off-station engine starts, particularly in extreme cold weather conditions, where isolated battery starts have been shown to degrade transient voltage and result in failed or hot engine starts, potentially causing engine damage. The modification aims to ensure reliable engine starts and protect the aircraft in austere environments. The government recognizes Leonardo Service Bulletin SB 139-360 Rev C, Part II (including Kit P/Ns 4G2430F00713) as the baseline solution but is open to equivalent FAA-approved modifications that meet the same requirements. **Key Requirements and Expected Deliverables** Respondents must demonstrate the ability to provide a system that allows simultaneous use of main and auxiliary batteries during engine start. Solutions must either utilize the OEM kit or an equivalent FAA-approved modification. The scope of supply must strictly exclude the physical batteries (the USAF already possesses compatible Nickel-Cadmium 44 Ah Main and 27 Ah Auxiliary batteries) and focus on installation hardware such as relays, brackets, wiring, and consumables. Vendors are expected to provide: - An engineering data package supporting FAA Supplemental Type Certificate (STC) and military Engineering Change Proposal (ECP). - Technical documentation including flight manual supplements, wiring diagrams, structural data, and software integration files to facilitate integration into baseline aircraft and training devices. - Proof of Part 145 certification. - Engineering analysis or electrical modeling demonstrating system performance at temperatures down to -40°C (-40°F). - Sustainment and tooling information, including proprietary or non-standard tooling, shelf-life limitations, storage requirements, and supply chain capability for replacement parts. - Facility suitability details, confirming compliance with safety and operational standards for battery kit installation. - Throughput and parallel installation capacity, describing facility layout and tooling to support simultaneous aircraft modifications. - Impact analysis on aircrew training syllabi and training device updates. - Commitment to provide future engineering revisions, safety notices, and updates related to the kit. **Cost, Schedule, and Manpower** Respondents are required to submit a Rough Order of Magnitude (ROM) cost estimate, broken down into non-recurring engineering (NRE) and modification kit/field installation costs. The estimate should include development, testing, kit delivery lead times, and initial operational capability timelines. Maintenance man-hour (MMH) estimates must be detailed, specifying environment assumptions, touch-labor versus passive time, crew size, and inclusion of post-installation testing and airworthiness sign-off. Vendors should describe their available certified manpower and crewing strategy for handling multiple, parallel aircraft modification lines. **Small Business Utilization** Small businesses must describe compliance with FAR 52.219-14, Limitations on Subcontracting, if the requirement is set aside. Large businesses should provide realistic small business utilization targets and rationale. **Contracting Entity and Location** The contracting entity is FA8692 HELICOPTER PGM AFLCMC WIH, a federal office under the Department of the Air Force, located at Wright Patterson Air Force Base, Ohio. The procurement is classified under NAICS Code 336413 (Aircraft Manufacturing), with a size standard of 1,500 employees. **Procurement Type and Special Considerations** This is a SOURCES SOUGHT notice, not a solicitation. There are no set-aside requirements specified at this stage, but respondents are asked to self-certify business size and status (Small Business, Woman-Owned, HUBZone, SDVOSB) and indicate company ownership and interest as prime or subcontractor. All prospective contractors must be registered in the System for Award Management (SAM). **Response Instructions and Contact Information** Responses must not exceed 15 pages (single-sided, 12-point font) and should be submitted electronically by 5:00 PM Eastern Time on December 11, 2026. Proprietary information must be clearly marked. Submissions may be handled by government-contracted support personnel under non-disclosure agreements. Primary contact for this opportunity is Chad Group ([email protected]), with Jeremy Perry ([email protected]) as the secondary contact. The notice remains active and can be accessed via SAM.gov at https://sam.gov/opp/8098a3f2adc74ed2b64c7776c6139c87/view. **Constant Elements Over Contract Lifecycle** Throughout the contract lifecycle, the requirement for FAA and military airworthiness support, exclusion of physical batteries from the modification kit, provision of technical data packages, sustainment and tooling support, and facility suitability will remain constant. The focus on reliable engine starts in extreme environments and integration with existing training and operational infrastructure will also persist. This opportunity is well-suited for contractors with proven experience in aircraft electrical modifications, FAA certification processes, and sustainment support for military aviation platforms. Interested parties should carefully review the technical and logistical requirements to determine alignment with their capabilities.