CARGO PLATFORM RELEASE BRACKET ASSEMBLY / EWN, C-130J HERCULES AIRCRAFT
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
DLA AVIATION
Contract Value
Not provided
Codes & Classification
Solicitation Number
SPE4A727R0062-Synopsis
NAICS
314999 - All Other Miscellaneous Textile Product Mills
Classification Code
1670
Additional Details
The Defense Logistics Agency (DLA) Aviation, a federal office under the Department of Defense, has issued a presolicitation notice for the procurement of the Cargo Platform Release Bracket Assembly, specifically for the C-130J Hercules aircraft. This procurement is identified under NSN 1670-01-586-4047 and IQC PR 1000247078, and will be conducted as an Indefinite Quantity Contract (IQC) with a base period of five years and no option periods. The estimated annual quantity required is 40 units.
The Cargo Platform Release Bracket Assembly is a critical component manufactured by CapeWell Aerial Systems LLC (CAGE 71304) under part numbers C23-85120100-1 and C23-85120100-10, as well as by Lockheed Martin Corp. (CAGE 98897) under part number C23-85120100-10. The procurement is classified under NAICS code 314999 (All Other Miscellaneous Textile Product Mills) and Product Service Code 1670, which pertains to parachutes, recovery systems, and related equipment.
The solicitation will be issued as an unrestricted procurement, meaning there are no set-aside requirements for small businesses or other socioeconomic categories. However, it is not a full and open competition, as only certified manufacturers of the specified part numbers are eligible to supply the item.
Key requirements for this contract include both contractor first article testing and contractor production lot testing. The timeline for deliverables is as follows:
- First article test report must be delivered within 120 days after receipt of order (ARO).
- Government approval or disapproval of the first article test report will occur within 105 days after receipt.
- Production lot test report is due 172 days after first article approval.
- Government approval or disapproval of the production lot test report will occur within 105 days after receipt.
- Delivery of production units is required within 30 days after government approval of the production lot test.
Inspection and acceptance terms are specified: first article inspection will occur at the origin, with acceptance at the destination; production units will be inspected and accepted at the origin. All shipments are FOB destination.
A notable requirement is that access to technical data for this item is restricted to contractors certified by the Department of Defense to access unclassified data, in accordance with DOD 5220.22M. Certification is obtained by submitting DD Form 2345 (Military Critical Technical Data Agreement) to the Defense Logistics Information Services.
The solicitation will incorporate DLAD Procurement Note L09, which mandates the use of a reverse auction process. Suppliers must register at DLA’s Procurex platform (dla.procurexinc.com) to participate in the online auction. Training resources are available online, and suppliers experiencing registration issues can contact the Procurex Help Desk via email ([email protected]) or toll-free at 866-412-7161.
Interested contractors can access the solicitation documents exclusively through the DLA Internet Bid Board System (DIBBS) at https://www.dibbs.bsm.dla.mil/rfp, with the anticipated issue date on or about November 24, 2026. No paper copies will be provided. The solicitation will be available in PDF format, requiring Adobe Acrobat Reader for viewing.
The primary point of contact for this procurement is Gladys Brown, who can be reached at [email protected] or by phone at 445-737-4113. The notice remains active, with a response deadline of December 24, 2026.
This opportunity is well-suited for contractors with proven manufacturing capabilities for the specified Cargo Platform Release Bracket Assembly, familiarity with DOD certification requirements, and experience in government reverse auction processes. The contract’s scope, technical requirements, and compliance obligations will remain consistent throughout its five-year duration.