Eastern Water Distribution System Reliability Project

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

Dalton Utilities

Contract Value

Not provided

Codes & Classification
Solicitation Number

PE-75553-NONST-2026-000000067

NAICS

-

Classification Code

-

Additional Details
Set Aside

None

Place of Performance

GA

SourceSLED
Documents1
The Eastern Water Distribution System Reliability Project, as solicited by Dalton Utilities, seeks qualified contractors to undertake a comprehensive infrastructure rehabilitation and construction initiative across multiple roadways within the state of Georgia. The primary objective of this procurement is to enhance the reliability and performance of the region’s water distribution network by replacing aging pipe infrastructure, upgrading valves and fire hydrants, installing new service connections, and integrating existing water mains. The scope of work also encompasses specialized tasks such as driveway crossings involving rock and concrete, ensuring minimal disruption to local access while modernizing critical utility assets. The project will span a significant number of roads, including but not limited to Tibbs Bridge Rd, Headrick Circle, N. Woodland Dr, Keeter Rd, Riverside Dr, North Dr, Timberlake Dr, Sane Rd, Cavender Rd, Riverbend Rd, Bettis Rd, Gordon Dr, Shirley Dr, Matha Sue Dr, Leon Cr, Conasauga Way, Deal Dr, Greenson Bend, Jackson Kinnamon, Ridley Rd, Callie Jones, Barney Pierce, Thorton Rd, Adam Rd, Stafford Rd, Keswick Dr, Pannel Dr, Cochran Dr, Hwy 225, Hwy 52 Alt, Crestview Dr, Vann Cr, and Mary Sue. The rehabilitation efforts will focus on replacing existing water distribution components and ensuring seamless integration with current infrastructure, thereby improving service reliability and supporting future community growth. Dalton Utilities, a state entity, is the contracting authority for this project. Interested parties should note that the procurement is classified under the identifier PE-75553-NONST-2026-000000067. The official solicitation and all associated documentation can be accessed via the Georgia Procurement Registry at the following URL: https://ssl.doas.state.ga.us/gpr//eventDetails?eSourceNumber=PE-75553-NONST-2026-000000067&sourceSystemType=gpr20. The procurement notice was posted on June 11, 2026, with responses due by December 14, 2026. While the notice does not specify set-aside requirements or special procurement considerations, contractors should review the provided drawings and specifications carefully to ensure compliance with all technical and performance requirements. The project is expected to deliver long-term improvements to the water distribution system, with a focus on durability, safety, and operational efficiency. Contractors evaluating this opportunity should possess demonstrated experience in large-scale water infrastructure projects, including pipeline replacement, utility coordination, and roadway restoration. The successful contractor will be expected to manage all aspects of construction, maintain clear communication with Dalton Utilities, and adhere to all applicable state and local regulations throughout the contract lifecycle. For further details and to access the full solicitation, interested parties are encouraged to visit the official notice link provided above.