Robins RAPID Construction OTA Progressive Design Build Fiber Replacement

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

FA8501 OPL CONTRACTING AFSC/PZIO

Contract Value

Not provided

Codes & Classification
Solicitation Number

FA8501-27-RAPID-CIRCUIT-F1-170129-OTA

NAICS

236220 - Commercial and Institutional Building Construction

Classification Code

Z2JZ

Additional Details
Set Aside

NONE

Place of Performance

Warner Robins, Georgia, UNITED STATES

SourceSAM
Documents5
The Department of the Air Force, through the 78th Civil Engineer Group at Robins Air Force Base in Warner Robins, Georgia, has issued a Special Notice under the Robins Agile Practices for Infrastructure Development (RAPID) umbrella framework. This notice, titled "Robins RAPID Construction OTA Progressive Design Build Fiber Replacement," seeks industry Solution Briefs for an anticipated Other Transaction Agreement (OTA) to replace Circuit F-01 from the Fowler Substation (Procurement Identifier: FA8501-27-RAPID-CIRCUIT-F1-170129-OTA). **Purpose and Scope** The primary objective of this procurement is to address the urgent need for replacement of the expired, high-risk Circuit F-01 cabling at Robins AFB. The project aims to prevent operational risks, mission delays, and escalating economic costs associated with infrastructure failure. Specifically, the scope includes the complete replacement of all 15kV, 500MCM cable throughout Circuit F-01, removal and replacement of broken breakers and faulty cable racks, installation of new bell ends on conduits, and pumping water and dirt from manholes. The work area is congested and impacted by ongoing airfield operations, requiring careful phasing and coordination to ensure the circuit remains operational via back feeding with circuit ties throughout the project. **Project Phasing and Deliverables** The procurement follows a Progressive Design-Build (PDB) methodology under the RAPID framework, leveraging the statutory authority of 10 U.S.C. § 2808a. The project is divided into two main phases: - **Phase 1 (Preconstruction & Collaborative Design):** This phase involves collaborative design development with stakeholders to achieve a 65% design milestone, site surveys, risk mitigation planning, schedule development, and establishment of an open-book Guaranteed Maximum Price (GMP) in accordance with the Statement of Objectives (SOO). - **Phase 2 (Final Design & Construction Execution):** Upon agreement, this phase encompasses completion of the final design and full construction execution, adhering to the agreed GMP and schedule. Contractors must assume the presence of hazardous materials and address requirements for worker notification, abatement, and disposal. Compliance with Robins Environmental Requirements (Section 01560) is mandatory, including submission of Waste Management Reports, Landfill Waste Tickets, Solid Waste Disposal Plans, and participation in the Qualified Recycling Program (QRP). Stormwater and erosion control coordination is also required. **Key Requirements and Evaluation Criteria** Interested respondents must submit a Phase 1 Solution Brief by 3:00 PM EST on or before November 20, 2026. The brief should not exceed five pages (excluding cover page and surety letters) and must be submitted via email to [email protected] and [email protected]. The Solution Brief must include: - Cover page with company information, UEI, mailing address, primary contact, and identification of the RAPID AOI. - Executive summary, team composition, and organization, highlighting qualifications, delivery capability, and understanding of the Robins AFB operational environment. - Demonstration of at least five years of relevant construction experience, particularly in occupied facilities, congested site logistics, complex mechanical/electrical integrations, and adherence to environmental and safety standards. - Statement of financial capacity and bonding, including current bonding limits and surety information. - Construction execution and phasing approach, including methodology and utility outage coordination. The selection process is a two-step, qualifications-based approach: - **Step 1:** Evaluation of written Solution Briefs to shortlist the most qualified firms (price is not evaluated). - **Step 2:** Interactive pitch presentations/interviews and evaluation of Phase 1 PDB Price Proposals from shortlisted teams to determine final selection. Evaluation factors include past relevant experience, team composition and organization, project approach and understanding, collaborative capability, real-time problem-solving and risk management, innovative design-build solutions, and financial capacity and bonding. The estimated magnitude of construction is $5M to $10M, provided for planning purposes only. **Contracting Entity and Classification** The contracting entity is FA8501 OPL CONTRACTING AFSC/PZIO, a federal office under the Department of Defense, Department of the Air Force. The place of performance is Warner Robins, Georgia, United States. The procurement is classified under NAICS Code 236220 (Commercial and Institutional Building Construction) and Product Service Code Z2JZ. There are no set-aside requirements for this opportunity. **Contact Information** - Primary Contact: Eric R. Jackson ([email protected]) - Secondary Contact: Angela Whitley ([email protected], 478-926-7989) **Additional Considerations** This Special Notice is not a solicitation for bids or proposals under the Federal Acquisition Regulation and does not commit the Government to make an award. Any resulting instrument will be an OTA for facility construction and repair. The Government reserves the right to modify, suspend, or cancel the notice, conduct technical exchanges, request clarifications, and negotiate with respondents. Attachments relevant to the project include the SOO, F1 Binder, and various base power grid documents. Participation and successful evaluation under this AOI may provide strategic opportunities for follow-on awards and multi-base utilization beyond the immediate requirement. **Summary for Contractors** Contractors with demonstrated experience in complex electrical infrastructure replacement, particularly in operational and congested environments, and with robust financial and bonding capacity, are encouraged to consider this opportunity. The project requires a collaborative, safety-focused approach, adherence to environmental standards, and the ability to work transparently with government stakeholders. The progressive design-build methodology and OTA framework offer flexibility and potential for broader engagement within the RAPID program. For further details and submission instructions, refer to the official notice at [SAM.gov](https://sam.gov/opp/cf8e1d878f2245f5ab25f69e4cfc5067/view).