The South Dakota Department of Game, Fish and Parks (GFP) has issued a solicitation for Statements of Interest from qualified engineering consulting firms to provide comprehensive administrative, design, and construction services for a critical fish barrier project at East Vermillion Lake Dam in McCook County, South Dakota. This initiative is aimed at preventing the upstream migration of invasive carp during high water events, which have previously caused partial erosion of the park entrance road at the spillway, thereby creating a potential pathway for these species to enter the lake system. Given East Vermillion Lake’s connection to other major recreational waters, such as Lake Thompson, the project is of significant importance to the region’s ecological integrity and recreational value.
The scope of work encompasses a broad range of engineering and consulting services, including geotechnical borings, site investigations, hydraulic modeling, and the development of fish barrier recommendations. Consultants will be responsible for preparing detailed design plans and specifications to effectively prohibit the passage of invasive carp into Lake Vermillion. Additional tasks include land surveying, hydrologic and hydraulic design, as well as construction inspection and survey activities. The selected firm will collaborate closely with SD GFP throughout the project lifecycle, ensuring that all deliverables meet the agency’s requirements and objectives.
Key deliverables include a comprehensive site investigation report and a design concepts report, both accompanied by cost estimates, which must be submitted by June 1, 2027. The consultant will also be required to provide detailed invoices, itemizing costs by project codes in half-hour increments, to facilitate transparent project management and billing.
Interested firms must submit their Statement of Interest by 5:00 PM Central Time on December 17, 2026. Electronic submissions (via media or email attachment) should be directed to James Gilkerson, P.E., at the Department of Game, Fish, and Parks, 523 E Capitol, Pierre, SD 57501-3182. For further project-specific information, prospective bidders are encouraged to contact Mr. Gilkerson at 605-773-4521 or via email at [email protected].
This procurement is classified under state code SD and is posted on the BIDMATCH_SLED platform. The notice can be accessed at https://postingboard.esmsolutions.com/3444a404-3818-494f-84c5-2a850acd7779/eventDetail/21411. The opportunity is open to firms with expertise in site investigation, hydraulic modeling, fish barrier design, and construction oversight, and is particularly suited to those with experience in aquatic invasive species management and water infrastructure projects.
Contractors evaluating this opportunity should note the emphasis on technical rigor, collaborative project management, and timely delivery of comprehensive reports and design documents. The project’s objectives and requirements are expected to remain constant throughout the contract lifecycle, focusing on the prevention of invasive carp migration and the protection of South Dakota’s valuable aquatic resources.