The U.S. Department of Transportation’s John A. Volpe National Transportation Systems Center (Volpe Center), under an Interagency Agreement, is soliciting qualified contractors to support the Federal Aviation Administration (FAA) Facilities Environmental Cleanup (ECU) Program through remediation and restoration activities at the QPI RCAG facility in Matawan, New Jersey. This procurement, classified under NAICS code 238910 (Site Preparation Contractors) and Product Service Code F999, seeks to address and mitigate environmental and human health risks associated with lead and polychlorinated biphenyl (PCB) contamination in soils at the specified FAA Eastern Service Area (ESA) location.
The primary objective of this contract is to execute a comprehensive Remedial Action (RA) to remove contaminated soils identified through prior Preliminary Assessment/Site Investigation (PA/SI) and Remedial Investigation (RI) activities conducted between 2020 and 2025. These investigations revealed soil contamination levels exceeding FAA action thresholds, specifically lead concentrations above 200 mg/kg and PCB concentrations above 0.25 mg/kg, as defined by U.S. Environmental Protection Agency (EPA) and New Jersey Residential Soil Remediation Standards.
Contractors are required to develop and submit a detailed Remediation and Restoration Work Plan within ten business days following the project kick-off meeting. This Work Plan must outline the technical approach, schedule, and methodologies for soil remediation, disposal, and site restoration, incorporating all relevant federal, state, and local regulatory requirements. In cases of regulatory inconsistency, the most stringent standard must be applied. The Work Plan must also address the identification and acquisition of all necessary permits, and include a Site Safety and Health Plan (SSHP) detailing personnel safety protocols, as well as a Risk Management Plan that identifies major site-specific risks and outlines mitigation strategies.
The contractor is responsible for all aspects of contaminated soil removal, including the preparation and submission of disposal sampling and documentation. While the FAA has engaged a Licensed Site Remediation Professional (LSRP) to select and approve disposal facilities, the contractor must provide detailed disposal methods and ensure compliance with all disposal requirements. Confirmatory sampling has already been completed at the site.
The procurement process includes a review period wherein the Volpe Center will evaluate the draft Work Plan within five business days of submission, after which the contractor must address any comments and submit a final version within an additional five business days. The scope of work and technical requirements are further detailed in the Statement of Work (SOW), which is available as an attachment to the solicitation.
This opportunity is set aside for SBA-eligible entities, emphasizing the government’s commitment to supporting small businesses in federal contracting. The place of performance is Matawan, New Jersey, and all work must be conducted in accordance with the outlined requirements.
The contracting entity for this solicitation is the Volpe National Transportation Systems Center, operating under the Department of Transportation, Office of the Secretary. Interested parties may direct inquiries to the primary contact, Roland Regan, at [email protected]. The solicitation was posted on September 11, 2026, with responses due by November 23, 2026. Additional details, including attachments and the full Statement of Work, can be accessed via the official SAM.gov opportunity listing.
Contractors considering this opportunity should have demonstrated expertise in environmental remediation, hazardous waste disposal, regulatory compliance, and site restoration, as well as the capacity to develop comprehensive work and safety plans in accordance with stringent federal and state standards.