Effingham County, through its Board of Commissioners, is seeking qualified contractors for the construction of a new 1.5-million-gallon concrete composite elevated water tank as part of the County’s Regional Water Supply Facilities initiative. This significant infrastructure project is designed to enhance the region’s water storage capacity and ensure reliable service for the community. The scope of work encompasses the provision of all labor, materials, and equipment necessary to deliver a fully operational elevated water storage facility.
Key elements of the project include the construction of the elevated tank and its foundation, comprehensive site clearing and grading, and the development of gravel access areas. The contractor will be responsible for installing approximately 12-inch PVC water main, flanged piping, control valves, and connecting the new system to the existing 16-inch water main. Additional site infrastructure includes fire hydrant assemblies, gate valves, steel casing with jack-and-bore installation, chain-link fencing and gates, rip-rap for erosion control, miscellaneous concrete work, and thorough erosion and sediment control measures. Complete site restoration is required upon project completion.
A critical component of the project is the installation of a comprehensive electrical, instrumentation, and SCADA (Supervisory Control and Data Acquisition) system. This includes electrical service and panels, conduit and wiring, gauges, controls, grounding, lighting, and pressure instrumentation, along with all necessary testing and inspections. The electrical plans also specify SCADA equipment, tank lighting, grounding provisions, service equipment, and the potential for obstruction lighting to meet FAA requirements if applicable.
Further deliverables include tank coating and painting, the application of lettering and logos, disinfection and bacteriological testing of the water system, and stormwater/NPDES monitoring and reporting. The contractor must also ensure completion of all regulatory and closeout requirements to facilitate the facility’s commissioning and operational readiness.
This procurement is managed by the Effingham County Board of Commissioners, a state-level contracting entity located in Georgia. Interested parties should note that the place of performance is within the state of Georgia. The solicitation was posted on April 11, 2026, with responses due by October 12, 2026. All project details, including the official notice and any updates, can be accessed via the Georgia Procurement Registry at the following URL: https://ssl.doas.state.ga.us/gpr//eventDetails?eSourceNumber=PE-65100-NONST-2027-000000057&sourceSystemType=gpr20.
Contractors considering this opportunity should have demonstrated experience in large-scale water infrastructure projects, including elevated tank construction, complex piping systems, and integrated electrical and SCADA installations. Compliance with all regulatory, safety, and environmental requirements is mandatory. This project represents a substantial and multifaceted undertaking, with long-term operational significance for Effingham County’s water supply system.