Lambdin Hall Chiller Replacement
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
Gordon State College
Contract Value
Not provided
Codes & Classification
Solicitation Number
PE-57600-RFQ-2027-000000016
NAICS
-
Classification Code
-
Additional Details
Documents4
Gordon State College has issued a solicitation for qualified contractors to undertake the replacement of the chiller system at Lambdin Hall, located on the college’s campus in Barnesville, Georgia. This procurement seeks to ensure the continued efficient operation and climate control of Lambdin Hall by replacing its existing chiller with a new, reliable system. The project is critical to maintaining a comfortable and functional environment for students, faculty, and staff, and aligns with the college’s commitment to facility modernization and energy efficiency.
The scope of work encompasses the complete removal of the current chiller unit and the installation of a new system, as detailed in the Invitation to Bid (ITB) documents provided by Gordon State College. Contractors are expected to deliver a turnkey solution, including all necessary labor, equipment, and materials to complete the chiller replacement in accordance with the college’s specifications and applicable codes. The successful contractor will be responsible for ensuring minimal disruption to campus operations during the project and for adhering to all safety and quality standards.
A key requirement for participation in this procurement is attendance at a mandatory pre-bid meeting, scheduled for Thursday, November 12, 2026, at 10:00 am. The meeting will be held in the Facilities conference room, located in building number 5 at 419 College Dr., Barnesville, GA. Only contractors with a representative present at this meeting will be eligible to submit a bid, underscoring the importance of understanding the project site and requirements firsthand.
The contracting entity for this opportunity is Gordon State College, a state institution. The procurement is classified under state-level codes, with all activities taking place within Georgia. Interested parties are encouraged to review the full Invitation to Bid and associated documents, which are accessible via the Georgia Procurement Registry at the following URL: https://ssl.doas.state.ga.us/gpr//eventDetails?eSourceNumber=PE-57600-RFQ-2027-000000016&sourceSystemType=gpr20.
The procurement process is structured as a single-step solicitation, with all bids due by March 12, 2026, at 5:12 pm. Contractors should carefully review all instructions and requirements outlined in the bid documents to ensure compliance and competitiveness. No information regarding set-aside requirements or special considerations has been provided in the notice.
This opportunity is well-suited for contractors with demonstrated experience in HVAC system replacements, particularly in institutional or educational settings. Firms should be prepared to coordinate closely with campus facilities staff and adhere to the project timeline and specifications as set forth by Gordon State College.
For further details, contractors should consult the official notice and associated documents available through the Georgia Procurement Registry.