Gathright Dam Motor Control Center Electrical Repairs in Covington, Virginia

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

W2SD ENDIST NORFOLK

Contract Value

Not provided

Codes & Classification
Solicitation Number

W9123627X1CW9

NAICS

238210 - Electrical Contractors and Other Wiring Installation Contractors

Classification Code

J061

Additional Details
Set Aside

None

Place of Performance

Covington, Virginia, UNITED STATES

SourceSAM
The U.S. Army Corps of Engineers, Norfolk District, has issued a Sources Sought notice to identify qualified firms for an anticipated firm-fixed-price construction contract involving comprehensive electrical renovations at the Gathright Dam intake tower in Covington, Virginia. This notice is for market research purposes only and does not constitute a solicitation for proposals, nor are specifications or drawings currently available. **Purpose and Scope:** The primary objective of this procurement is to modernize and upgrade the motor control and facility control systems at the Gathright Dam. The project centers on the replacement of existing 480-volt motor control centers (MCC2 and MCC3) with new units, including all associated starters, controls, feeders, conduits, control circuits, and field wiring. The scope further encompasses the replacement of transformer XFMR-3 in-kind, and the verification and replacement of conduits affected by equipment upgrades or compromised by corrosion, in accordance with the conduit and cable schedule. A significant component of the project is the full replacement and modernization of the facility’s control system. This includes the demolition of outdated control, power, and communication panels, and the installation of new Programmable Logic Controller (PLC) panels, Remote Input/Output (RIO) panels, Human-Machine Interface (HMI) screens, and all related network wiring, cabling, and conduit infrastructure. The project also requires the replacement of instrumentation for wet well gate displacement (linear displacement sensors) to be integrated into the new control system. Additionally, lighting upgrades are specified to address the end-of-life of existing metal-halide high bay and fluorescent wallpack lights, with a bid option for a warehouse-style high bay luminaire lifting mechanism designed for low power consumption per luminaire. **Key Requirements and Deliverables:** - Replacement of MCC2 and MCC3 motor control centers and associated electrical infrastructure. - In-kind replacement of transformer XFMR-3. - Field verification and replacement of conduits as necessary. - Demolition and replacement of control, power, and communication panels. - Installation and programming of new PLCs, RIO panels, HMI screens, and integration of new instrumentation. - Reprogramming of the existing Sutron system. - Lighting system upgrades, including optional high bay luminaire lifting mechanism. - All work must be carefully phased and coordinated to ensure that facility buildings remain occupied and operational throughout the contract period. **Contracting Entity and Location:** The contracting authority is the U.S. Army Corps of Engineers, Norfolk District (W2SD ENDIST NORFOLK), operating under the Department of Defense, Department of the Army. The place of performance is Covington, Virginia, United States. **Classification and Codes:** - NAICS Code: 238210 (Electrical Contractors and Other Wiring Installation Contractors), with a small business size standard of $19,000,000. - Product Service Code (PSC): J061 (Maintenance, Repair, and Rebuilding of Equipment – Electric Wire and Power Distribution Equipment). **Procurement Type and Considerations:** This is a Sources Sought notice, not a solicitation. The estimated construction price range is between $1,000,000 and $5,000,000. The Government is seeking information from all business sizes and socio-economic categories, including 8(a), HUBZone, Service-Disabled Veteran-Owned Small Business (SDVOSB), and Woman-Owned Business (WOB). The acquisition strategy will be informed by the responses received. **Period of Performance:** The anticipated construction period is approximately 360 calendar days from the issuance of the Notice to Proceed. **Response Requirements:** Interested firms are requested to submit a capability statement (maximum 5 pages) addressing: - Company name, address, point of contact, phone, and email. - Interest in bidding on the future solicitation. - Capability to perform a project of this magnitude and complexity, including at least three relevant project examples from the past five years. - Business size and socio-economic status. - Information on joint ventures, mentor-protégé, or teaming arrangements. - Bonding capability, supported by a letter from a bonding company. **Submission Instructions and Contact Information:** Responses should be submitted via email to Caleb Bookout ([email protected]) and copied to Luke D. Hedlund ([email protected]) no later than close of business on November 19, 2026. All prospective contractors must be registered in the System for Award Management (SAM) prior to contract award. **Additional Information:** This notice does not obligate the Government to issue a solicitation or award a contract, nor will the Government reimburse any costs incurred in responding. The official solicitation, when released, will be posted on SAM.gov under the provided opportunity ID. For further details, contractors are encouraged to review the notice on SAM.gov (https://sam.gov/opp/2cee017bee42460fb76dcc1519629557/view) and direct any questions to the listed points of contact. This opportunity is well-suited for experienced electrical contractors with a proven track record in complex control system upgrades and facility electrical renovations, particularly in operational, mission-critical environments.