FA8501-27-RAPID-990029 RPR RPL HVAC SYSTEM BLDG 300 Bay A/Headhouse
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
FA8501 OPL CONTRACTING AFSC/PZIO
Contract Value
Not provided
Codes & Classification
Solicitation Number
FA8501-27-RAPID-990029_RPR_RPL_HVAC_SYSTEM_BLDG_300
NAICS
238220 - Plumbing, Heating, and Air-Conditioning Contractors
Classification Code
Z2JZ
Additional Details
The Department of the Air Force, through the 78th Civil Engineer Group at Robins Air Force Base, Georgia, has issued a Special Notice under the Robins Agile Practices for Infrastructure Development (RAPID) umbrella framework. This notice, titled "FA8501-27-RAPID-990029 RPR RPL HVAC SYSTEM BLDG 300 Bay A/Headhouse," seeks industry Solution Briefs for an anticipated Other Transaction Agreement (OTA) to repair, modernize, and sustain critical HVAC and associated interior building systems within Facility 300 at Robins AFB.
**Purpose and Scope**
The primary objective of this procurement is to address the urgent need for replacement or modernization of end-of-life HVAC equipment and to implement improvements that ensure reliable climate control and energy-efficient operations. The scope extends beyond HVAC systems to include remediation of interior conditions such as accessibility barriers, lead-based paint, asbestos-containing flooring, degraded finishes, and workspace configuration. These upgrades are essential to enhance occupant safety, facility reliability, code compliance, and to support uninterrupted mission operations for Facility 300’s multi-tenant organizations, which include supply-chain management, network support, special operations/rotary-wing management, and C-5 cargo aircraft management.
Facility 300, constructed in 1942, is a critical asset supporting several Department of War missions. The building’s systems are severely degraded, with HVAC units well past their lifecycle, frequent failures, high maintenance costs, and inadequate climate control. Additional hazards include peeling lead-based paint, asbestos-containing flooring, and non-compliant accessibility in the basement. The project aims to modernize the workspace, prevent safety hazards, optimize space configuration, improve occupant morale, and ensure compliance with energy, safety, and Unified Facilities Criteria (UFC) codes. Notably, the facility will remain in partial operation throughout the project, requiring careful phasing and minimal disruption to ongoing activities.
**Key Requirements and Expected Deliverables**
The Government is seeking integrated, commercially viable solutions that are safe, resilient, and schedule-credible. Respondents must demonstrate the ability to restore reliable environmental control, address end-of-life HVAC equipment, and remediate affected interior conditions. The approach should sustain uninterrupted operations for Facility 300’s mission partners while improving energy performance, occupant safety, accessibility, maintainability, and compliance with applicable standards.
The procurement is structured under the RAPID framework as a Build-Only execution, leveraging a 100% completed Government-furnished design package. There is no collaborative design-builder phase; instead, the project transitions directly to rapid construction execution under an OTA structure, intended to bypass administrative procurement delays.
**Submission and Evaluation Process**
Interested contractors are required to submit a Phase 1 Solution Brief, limited to five written pages (excluding the cover page), by 3:00 PM Eastern Standard Time on or before November 16, 2026. Submissions should be sent via email to Jimmy Ezzell ([email protected]) and Amelia Kelly ([email protected]).
The Solution Brief must include:
- Cover Page: Company name, UEI, mailing address, primary point of contact, email, telephone, and identification of the RAPID AOI.
- Executive Summary: Qualifications, anticipated delivery capability, and any material assumptions regarding capability, staffing, access, bonding, or teaming.
- Past Relevant Construction Experience: Minimum five years of experience with projects of comparable size, scope, and complexity, particularly in large commercial or government facilities involving HVAC repair/replacement. Emphasis on performance in occupied facilities, site logistics, restricted areas, and adherence to environmental and safety standards.
- Team Composition and Organization: Adequacy of organizational structure and qualifications of key personnel (Project Manager, Site Superintendent, Site Safety and Health Officer, Quality Control Manager).
- Construction Execution and Phasing Approach: Technical understanding of the design, methodology for execution, utility outage coordination, and realism of the proposed master schedule.
- Financial Capacity and Bonding: Statement of financial capacity, current bonding capacity, name of surety, and other relevant information.
The selection process follows a two-step, best-value approach:
- Step 1: Evaluation of written Solution Briefs to establish a shortlist of highly qualified firms (price not evaluated).
- Step 2: Shortlisted respondents participate in interactive pitch presentations/interviews and submit price proposals. Evaluation focuses on constructability review, risk management, collaborative execution, problem-solving, and financial capacity/bonding. The estimated magnitude of construction is $20M to $40M, provided for planning purposes only.
Final selection will be based on the combined technical qualifications, execution pitch, and price proposal that represent the most advantageous offer to the Government. The Government reserves the right to request clarifications, negotiate, modify, suspend, or cancel the notice, and to make no award if deemed necessary.
**Contracting Entity and Contact Information**
- Contracting Entity: FA8501 OPL CONTRACTING AFSC/PZIO (Federal Office)
- Department: Department of Defense
- Agency: Department of the Air Force
- Place of Performance: Warner Robins, Georgia, United States
- NAICS Code: 238220 (Plumbing, Heating, and Air-Conditioning Contractors)
- Product Service Code: Z2JZ
- Set-Aside Type: None
- Primary Contact: Eric R. Jackson ([email protected])
- Secondary Contact: Jimmy Ezzell ([email protected])
- Notice URL: [SAM.gov Opportunity](https://sam.gov/opp/ff72be1f24b74133b217238df0a3f376/view)
**Special Considerations**
This Special Notice is not a solicitation for bids or proposals under the Federal Acquisition Regulation and does not commit the Government to make an award. Any resulting agreement will be an OTA for facility construction and repair under 10 U.S.C. § 2808a. The Government will address labor requirements such as Davis-Bacon and prevailing wage during the pitch phase or before award, incorporating them as applicable.
Attachments provided with the notice include the Statement of Objectives, complete set of drawings, HAZMAT report, updated specifications, and submittal register, offering comprehensive information for respondents.
**Strategic Opportunity**
While the immediate requirement is for HVAC repair and modernization at Bay A and the Headhouse of Building 300, successful participation may lead to expanded opportunities, including follow-on awards and multi-base utilization under the RAPID framework.
**Summary for Contractors**
Contractors with proven experience in large-scale HVAC and interior modernization projects, particularly in occupied government facilities, and with robust organizational, technical, and financial capacity, are encouraged to consider this opportunity. The project demands a high level of coordination, risk management, and adherence to safety and environmental standards, with the potential for significant strategic engagement beyond the initial scope.