Charleston Sign Shop Roof Replacement

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

Department of Transportation

Contract Value

Not provided

Codes & Classification
Solicitation Number

69850

NAICS

-

Classification Code

-

Additional Details
Set Aside

None

Place of Performance

-

SourceSLED
The South Carolina Department of Transportation (SCDOT) has issued a procurement notice for the Charleston Sign Shop Roof Replacement project. The primary objective of this initiative is to remove the existing metal roof system and roof insulation at the Charleston Sign Shop facility and install a new metal roof and updated roof insulation. This project aims to enhance the structural integrity and weather resistance of the facility, ensuring a safe and durable environment for ongoing operations. The scope of work encompasses the complete removal of the current roofing materials, including both the metal roof and insulation, followed by the installation of new, high-quality metal roofing and insulation systems. Contractors are expected to deliver a fully functional and professionally installed roof that meets all relevant building codes and standards, providing long-term protection and energy efficiency for the facility. The contracting entity for this project is the South Carolina Department of Transportation, a state-level organization responsible for infrastructure maintenance and improvement across South Carolina. The place of performance is within the state of South Carolina (SC), specifically at the Charleston Sign Shop. Interested parties should note that the procurement identifier for this opportunity is 69850, and further details can be accessed via the official notice URL: https://scbo.sc.gov/online-edition?s=69850. The notice was posted on February 11, 2026, with a response deadline set for November 19, 2026. Contractors considering this opportunity should review the requirements carefully and ensure their capabilities align with the project’s demands, particularly in the areas of metal roofing and insulation installation. While the notice does not specify set-aside requirements, procurement type, or special considerations, it is advisable to consult the provided links for any updates or additional documentation as the procurement process progresses. This project represents a straightforward, single-step procurement process, and all communications and submissions should be directed through the South Carolina Department of Transportation’s official channels. Contractors with relevant experience in roof replacement and insulation installation are encouraged to evaluate this opportunity for alignment with their expertise and resources.