KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

FERMILAB - DOE CONTRACTOR

Contract Value

Not provided

Codes & Classification
Solicitation Number

RFP-383167-CD

NAICS

237130 - Power and Communication Line and Related Structures Construction

Classification Code

Z2MZ

Additional Details
Set Aside

NONE

Place of Performance

Batavia, Illinois, UNITED STATES

SourceSAM
The Department of Energy, through its contractor Fermilab, has issued a solicitation (RFP-383167-CD) for the comprehensive reconstruction and renovation of the Kautz Road Substation (KRS) in Batavia, Illinois. This initiative, designated as UIP Subproject 2 (SP-2), is a critical infrastructure project aimed at revitalizing the KRS to ensure reliable electricity supply for various laboratory buildings and systems. These systems support both conventional facility operations and specialized process utility requirements, underscoring the substation’s essential role in advancing Fermilab’s scientific mission and accommodating future operational demands. The scope of work requires a qualified general contractor to provide all necessary supervision, labor, materials, tools, equipment, and appurtenances to execute the project as detailed in the provided drawings and technical specifications. Contractors are expected to manage all aspects of the construction process, including transportation, overhead, bonding, safety oversight, quality control, and supervision, ensuring diligent and complete fulfillment of the contract requirements. A key scheduling constraint is the alignment of construction activities with Fermilab’s accelerator shutdown period. The anticipated on-site start date is January 1, 2028, with completion targeted for January 1, 2030. These dates are subject to adjustment based on laboratory needs, but the contractor must ensure all work is performed within this shutdown window. The project is structured around several critical milestones: - **Milestone 1:** Within 60 calendar days of the Notice to Proceed, contractors must complete all necessary submittals, RFIs, and obtain approval of shop drawings for fabrication and procurement. - **Milestone 2:** On January 4, 2028, access to the Kautz Road Substation yard will be granted, marking the commencement of construction activities. - **Milestone 3:** By March 31, 2028, the building foundation must be completed and ready for placement of the new prefabricated control house building, which will be provided by FermiForward. - **Milestone 4:** On July 2, 2029, formal Authorization for Use and Possession (AUP) of the KRS Substation facility will be issued, including completion of remedial work following removal of site trailers, but excluding seasonal work and final punch list items. - **Milestone 5:** The project must reach full completion by September 30, 2029. The procurement is classified under NAICS Code 237130 (Power and Communication Line and Related Structures Construction), with no set-aside requirements, making it open to all qualified contractors. The place of performance is Batavia, Illinois, and the contracting entity is Fermilab, operating under the Department of Energy. Interested parties should note that the solicitation is active, with a response deadline of December 18, 2026. The primary point of contact for this opportunity is Chris Daley, who can be reached at [email protected] or 630-840-4256. Additional details, including amendments and attachments, are available via the official SAM.gov listing (Opportunity ID: 558314f2c9aa4128b07bd410f81a4ccc). Contractors considering this opportunity should ensure their capabilities align with the technical, scheduling, and quality requirements outlined, and be prepared to manage a complex, multi-phase construction project within a federally regulated environment. The successful completion of this project will be instrumental in supporting Fermilab’s ongoing and future research initiatives.
Documents19