INDUSTRY DAY: FORT HUNTER LIGGETT BARRACKS PDB-OTA

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

W072 ENDIST LOUISVILLE

Contract Value

Not provided

Codes & Classification
Solicitation Number

W912QR-INDUSTRYDAY-FHLBARRACKS

NAICS

236220 - Commercial and Institutional Building Construction

Classification Code

Y1JZ

Additional Details
Set Aside

NONE

Place of Performance

Jolon, California, UNITED STATES

SourceSAM
The U.S. Army Corps of Engineers (USACE), Louisville District, has issued a Special Notice to inform industry stakeholders of an upcoming procurement opportunity for the design and construction of new barracks facilities at Fort Hunter Liggett, located in Jolon, California. This initiative, titled "Design and Construction of four (4) Collective Training Enlisted (CTE) Barracks and one (1) Advanced Skills Training (AST) Barracks," will be executed under a Progressive Design-Build (PDB) approach utilizing Other Transaction Authority (OTA) for Construction as authorized by 10 USC §2808a. The primary objective of this procurement is to replace five existing multi-story barracks (each approximately 39,000 square feet) with four new CTE Barracks (each approximately 46,000 square feet) and one AST Barracks (approximately 45,000 square feet). The new CTE Barracks will feature open bay sleeping areas, integrated officers’ sleeping rooms, team rooms, laundry facilities, restrooms, showers, storage, and janitorial closets. The AST Barracks will include sleeping quarters with bathrooms, study/day rooms, laundry rooms, storage, and janitorial closets. Both facility types will require comprehensive supporting infrastructure, including site development, utilities, lighting, paving, storm drainage, electrical, plumbing, fire protection, HVAC, information systems, landscaping, signage, sustainability/energy features, cybersecurity measures, and all necessary fixtures, furnishings, and equipment. The scope also encompasses the demolition and disposal of the five existing barracks structures. USACE will host an Industry Day on November 17, 2026, at 0900 Pacific Time at Fort Hunter Liggett, Building 3300, Classrooms 118 & 119. This event aims to provide an overview of the project, acquisition strategy, and anticipated requirements, as well as to facilitate dialogue with potential offerors regarding the PDB/OTA framework. Industry Day will allow for general questions and feedback; however, all discussions are considered unofficial and non-binding until the formal Request for Qualifications (RFQ) is released. For those unable to attend in person, a virtual participation option will be available via Microsoft Teams. The acquisition strategy will employ a streamlined, two-step competitive selection process. In Step 1, interested firms will submit Statements of Qualifications, from which up to three of the most qualified firms will be down-selected. In Step 2, these firms will participate in live pitch presentations, after which one firm will be invited to enter exclusive negotiations. The selected firm will be required to submit a detailed price proposal for Phase 1 (100% design), with subsequent negotiation of design fees, payment milestones, and agreement terms. The construction phase will be added as a bilateral modification, with a Guaranteed Maximum Price (GMP) established. The resulting agreement will be firm-fixed-price and will encompass both design/preconstruction services (Phase 1) and all construction activities (Phase 2). This procurement is classified under NAICS Code 236220 (Commercial and Institutional Building Construction) and Product Service Code Y1JZ. There are no set-aside requirements for this opportunity. The contracting entity is W072 ENDIST LOUISVILLE, a federal office under the Department of Defense, Department of the Army. The primary point of contact for this notice is Jesse Scharlow ([email protected], 502-315-6183). The project location is Fort Hunter Liggett, Jolon, California. Interested parties are encouraged to monitor the official solicitation announcement for complete details and submission instructions. Draft documents may be released for industry feedback prior to the formal RFQ, but all requirements and instructions are subject to change until the official solicitation is issued. For further information, including access requirements for Fort Hunter Liggett and virtual participation details, refer to the official notice at https://sam.gov/opp/c36ebbda60b34d2ea282b81883206f11/view.