St. Lucie South Jetty Repair Industry Day
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
W074 ENDIST JACKSNVLLE
Contract Value
Not provided
Codes & Classification
Solicitation Number
W912EP27Z1CUE
NAICS
237990 - Other Heavy and Civil Engineering Construction
Classification Code
Z1KA
Additional Details
Documents4
The U.S. Army Corps of Engineers, Jacksonville District, has issued a Special Notice announcing an upcoming Industry Day for the St. Lucie South Jetty Rehabilitation project in Martin County, Florida. This event, scheduled for December 7, 2026, at 10:00 AM EST, is intended to engage the construction industry—particularly those specializing in heavy and civil engineering—to gather feedback, assess capabilities, and inform the acquisition strategy for a significant jetty repair effort anticipated for award in fiscal year 2027.
**Purpose and Scope**
The primary objective of this procurement is the rehabilitation of the head structure of the South Jetty at St. Lucie Inlet. The project encompasses the reconstruction of the jetty’s rounded head and the transition to the trunk, underpinned by a marine mattress foundation and protected by large toe stones. The work will require substantial manipulation and integration of both new and existing stones to achieve the necessary interlocking for structural stability. Notably, the reworking of existing stones is limited to their incorporation with new materials; retrieval of stones outside the design template is not required.
The South Jetty, originally constructed to a length of approximately 1,320 feet with a crest height of 5.5 feet (NAVD88) and a crest width of 10 feet, features side slopes of 1V:2H. An existing asphalt walkway, about 1,090 feet long, runs along the jetty crest and will need to be removed within the repair area as work progresses. All removed or damaged asphalt must be properly disposed of off-site and does not require replacement.
**Key Requirements and Deliverables**
The anticipated scope of work includes:
- Excavation of existing bed material to install a widened marine mattress foundation, expanding the jetty footprint up to 85 feet along the centerline.
- Placement of 9- to 15-ton toe protection stones for foundation and scour protection.
- Removal and off-site disposal of the remaining asphalt walkway and any debris.
- Repair of the existing core and selective reworking of the single armor stone layer.
- Placement of a second layer of 9- to 15-ton armor stone to further stabilize the structure.
Contractors should anticipate the need for clearing and restoration of access routes and staging areas, with all disturbed areas to be returned to pre-construction conditions or better. Expansion or improvement of access routes may be necessary, within the limits defined by approved permit drawings.
**Environmental and Operational Considerations**
Construction activities are permitted year-round but must be confined to daylight hours. Special environmental restrictions and monitoring will apply during turtle and shorebird nesting seasons, as well as for other Endangered Species Act (ESA) protected species. All excavated material must be screened through a 2-inch mesh before use as backfill or beach material, with excess material disposed of off-site. The use of water access is permitted, but no dredging outside the construction limits is allowed. Restoration of the east staging area and native vegetation is required upon project completion.
**Industry Day and Information Requests**
The Industry Day event will be held at 2401 SE Monterey Rd, Stuart, FL 34996. All attendees must present a valid driver’s license or ID for security clearance. For those unable to attend in person, virtual participation is available via Microsoft Teams, with meeting credentials provided in the notice.
Interested parties are encouraged to submit a capabilities statement, responses to a detailed questionnaire, and any questions for the Government by December 4, 2026, at 1:00 PM EST. Breakout sessions with the Government are available on a first-come, first-served basis during the afternoon of the event.
The Government seeks industry input on construction methodologies, equipment, environmental protection measures (including ESA species exclusion and turbidity control), safety constraints, and operational considerations for winter work. This feedback will inform the final acquisition strategy.
**Contracting Entity and Classification**
- Contracting Entity: U.S. Army Corps of Engineers, Jacksonville District (W074 ENDIST JACKSNVLLE)
- Department: Department of Defense, Department of the Army
- NAICS Code: 237990 (Other Heavy and Civil Engineering Construction)
- Small Business Size Standard: $45 million
- Product Service Code: Z1KA
- Estimated Price Range: $25–$50 million
- Estimated Period of Performance: 730 calendar days
- Place of Performance: Stuart, Florida, USA
**Contact Information**
- Project Manager: Jim LaGrone ([email protected], 904-521-2086)
- Primary Point of Contact: Nicole M. Batista-Cruz ([email protected])
- Secondary Point of Contact: Ruth Rodriguez ([email protected])
**Additional Notes**
This notice is for planning purposes only and does not constitute a solicitation or a commitment to award a contract. No reimbursement will be made for any costs associated with responding to this notice or attending the Industry Day. All interested contractors must be registered in the System for Award Management (SAM) to be eligible for future contract awards.
Contractors with experience in heavy marine construction, jetty or breakwater rehabilitation, and environmental compliance are encouraged to participate and provide input. This opportunity is particularly relevant for firms capable of managing complex marine construction projects with significant environmental and operational constraints.
For further details and updates, interested parties should monitor the official notice on SAM.gov (Opportunity ID: 83773451369840cf8f271d873b8cf7bd).