Production of Small Unmanned Aircraft Systems (sUAS) Lethality Payloads at Pine Bluff Arsenal
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
ACC
Contract Value
Not provided
Codes & Classification
Solicitation Number
W519TC27CSUAS
NAICS
-
Classification Code
-
Additional Details
Documents1
The U.S. Army Materiel Command (AMC), under the Department of Defense and the Army Contracting Command (ACC), has issued a Special Notice seeking industry partnership solutions for the modernization and production of Small Unmanned Aircraft Systems (sUAS) lethality payloads at Pine Bluff Arsenal (PBA), Arkansas. This notice, titled "Production of Small Unmanned Aircraft Systems (sUAS) Lethality Payloads at Pine Bluff Arsenal," is not a solicitation for proposals or governed by the Federal Acquisition Regulation (FAR); rather, it is a market research and concept exploration initiative under the authority of 10 U.S.C. 7544, aimed at structuring a potential Public-Private Partnership (P3).
**Purpose and Scope**
The primary objective of this Partnership Solutions Opening (PSO) is to identify innovative, industry-driven approaches to modernize PBA’s production facilities to Industry 4.0 and 5.0 standards. The modernization effort is intended to enable flexible, modular manufacturing capabilities for lethal energetic payloads and Electronic Safe & Arming Devices (ESAD) for sUAS. The envisioned outcome is a cooperative arrangement where private investment accelerates facility upgrades, integrating advanced automation and digital technologies, while supporting both national security and commercial enterprise needs.
**Key Requirements and Objectives**
Respondents are expected to submit whitepapers detailing conceptual solutions for:
- Modernizing PBA facilities to Industry 4.0/5.0 standards, including smart factory integration, cyber-physical systems, IoT, and collaborative robotics.
- Establishing scalable, flexible production lines capable of manufacturing various explosives, payload sizes, ESADs, and energetic airframes.
- Providing proof of private equity or internal corporate capital sufficient to fund 100% of the required capital expenditures (CapEx) for facility upgrades, equipment procurement, and installation.
- Outlining operational concepts for co-production, including capacity splits between government and commercial use, and compliance with statutory requirements under 10 U.S.C. 7544.
PBA offers approximately 100,000 square feet of storage and production capacity across multiple buildings in area 34-000, with existing utilities (electricity, water, air sewer, natural gas, steam) and robust safety engineering designed for handling volatile compounds. The government will provide direct labor, engineering, base operations, logistical, environmental, and safety support, including expedited site-licensing updates and coordination for hazardous materials exceptions. Contractors are responsible for any capital investments needed to utilize existing utilities.
**Expected Deliverables**
Whitepaper submissions must address:
- Technical and automation approach, including production capabilities and integration of Industry 4.0/5.0 technologies.
- Financial and investment plan, with detailed CapEx breakdown and proof of funding.
- Co-production operational concept, specifying capacity allocation and compliance with statutory provisions.
**Contracting Entity and Location**
- Contracting Entity: Army Contracting Command (ACC), a federal sub-command under the Department of Defense and Department of the Army.
- Place of Performance: Pine Bluff Arsenal, Pine Bluff, Arkansas, United States.
**Procurement Type and Special Considerations**
This PSO is a request for partnership solutions, not a formal procurement or RFP. The government seeks private sector investment to modernize facilities, with the expectation that permanent upgrades become government property, while the contractor retains operational use for the duration of the agreement. The cooperative arrangement may utilize a Build-to-Operate (BTO) model, allowing the industry partner to operate the facility until capital investment and profit thresholds are met, after which operational control transitions to the government.
Mandatory statutory provisions include indemnification, government rights to suspend or terminate commercial activity during emergencies, and a non-interference mandate ensuring commercial production does not impede military work.
**Submission Process and Evaluation**
The partnership process consists of three phases:
1. Initial whitepaper submission (due by 4:00 PM CST on 14 December 2026).
2. Invitation for highly assessed respondents to participate in a mandatory on-site visit and technical exchange at PBA.
3. Request for final whitepaper submissions from Phase II participants, followed by government review and potential cooperative planning.
Submissions will be evaluated based on technological innovation, financial viability, and maximization of PBA resources.
**Contact Information**
- Primary Contact: Debby C. Broyles ([email protected], 520-693-1301)
- Secondary Contact: Heather Johns ([email protected])
**Constant Elements**
Throughout the contract lifecycle, the partnership will be governed by statutory requirements under 10 U.S.C. 7544, with a focus on facility modernization, co-production, and compliance with safety and environmental standards. The government will retain ownership of permanent facility upgrades, and the contractor will be responsible for capital investment and operational compliance.
For further details and submission instructions, interested parties should refer to the official notice on SAM.gov (Opportunity ID: 5d57de9b1ae146428177e11108eeec68).
This opportunity is best suited for contractors with expertise in advanced manufacturing, automation, explosives production, and facility modernization, who are capable of financing and executing large-scale capital improvements in a secure, government-owned environment.