Mill Creek Parking Lot Fdr Project
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
Bulloch County Board of Commissioners
Contract Value
Not provided
Codes & Classification
Solicitation Number
PE-61600-NONST-2027-000000069
NAICS
-
Classification Code
-
Additional Details
Documents2
The Bulloch County Board of Commissioners has issued a solicitation for the Mill Creek Parking Lot FDR Project, inviting sealed bids from contractors registered with the Georgia Department of Transportation (GDOT). This initiative, designated as FY27-ENGCP-005-5, aims to rehabilitate the Mill Creek parking lot through a comprehensive full depth reclamation (FDR) process. The primary objective is to enhance the structural integrity and longevity of the parking lot by reclaiming the existing asphalt surface course and integrating it into the subgrade. The process will involve mixing Portland Cement into the soil to create a soil cement stabilized base, ensuring a durable foundation for subsequent paving.
The scope of work encompasses a broad range of road construction operations, including but not limited to traffic control, grading, storm drainage installation, subgrade preparation, graded aggregate base construction, asphalt paving, signage and marking, and final site stabilization. Contractors are expected to deliver a fully rehabilitated parking lot that meets all specified engineering and safety standards, with particular attention to proper drainage, surface stability, and clear traffic markings.
A key requirement for participation is that all contractors must be actively approved as GDOT Prequalified Contractors at the time of bid submission. Evidence of this qualification must be provided, as listed on GDOT’s Directory of Prequalified Contractors. The deadline for bid submission is November 20, 2026, at 11:00 AM EDT. Only contractors meeting this prequalification criterion will be considered for award.
The contracting entity for this project is the Bulloch County Board of Commissioners, a state-level organization located in Georgia. The project will be performed within the state of Georgia (GA), and all operations must comply with relevant state and local regulations. Interested parties can access further details and official documents through the Georgia Procurement Registry at the following URL: https://ssl.doas.state.ga.us/gpr//eventDetails?eSourceNumber=PE-61600-NONST-2027-000000069&sourceSystemType=gpr20.
This procurement represents a significant opportunity for qualified contractors specializing in road and parking lot construction, particularly those experienced in full depth reclamation and soil stabilization techniques. The project’s requirements and deliverables are clearly defined, and the prequalification stipulation ensures a competitive and capable pool of bidders. Contractors are encouraged to review all available documentation and ensure compliance with GDOT standards prior to submitting their bids.
For further information, contractors should refer to the official notice and associated documents provided by the Bulloch County Board of Commissioners via the Georgia Procurement Registry.