CA-SAN LUIS NWR-FIRE SYSTEM REHAB
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
FWS CONTRACTING ACTIVITY
Contract Value
Not provided
Codes & Classification
Solicitation Number
140FF027Q0035
NAICS
238220 - Plumbing, Heating, and Air-Conditioning Contractors
Classification Code
Z2JZ
Additional Details
The U.S. Fish & Wildlife Service (FWS), Region 8, is seeking qualified small business contractors to undertake a comprehensive rehabilitation of the fire protection and domestic water systems at the San Luis National Wildlife Refuge Visitor Center, located at 8975 Wolfsen Road, Los Banos, California 93635. This procurement, titled "CA-SAN LUIS NWR-FIRE SYSTEM REHAB" (Procurement Identifier: 140FF027Q0035), is issued as a combined synopsis/solicitation in accordance with FAR Subpart 12.6, and is a total small business set-aside under NAICS code 238220 (Plumbing, Heating, and Air-Conditioning Contractors), with a size standard of $19.0 million.
The primary objective of this project is to restore life-safety compliance and operational reliability of the refuge’s fire protection and domestic water systems. The scope of work includes ensuring all rehabilitated systems meet the requirements of the National Fire Protection Association (NFPA), California Building, Plumbing, and Electrical Codes, as well as American Water Works Association (AWWA) and American Society of Sanitary Engineering (ASSE) standards. Key deliverables involve the repair and replacement of water system components, installation and/or replacement of sprinkler systems, restroom component upgrades, and proper disposal of replaced materials. Contractors must demonstrate relevant experience, possess appropriate California state licenses, and be certified for water system repairs and fire protection system work.
The estimated construction magnitude ranges from $200,000 to $225,000, and the anticipated performance period is 180 days from the issuance of the Notice to Proceed. The contract will be awarded as a firm-fixed-price agreement, with evaluation based on technical approach and price. All proposals must be submitted electronically via email and must include unit and total pricing, company letterhead, a completed pricing form, SAM.gov UEI code, and contact information. Offerors are required to comply with FAR provisions 52.212-1 and 52.212-3, including representations and certifications for commercial items.
Bonding requirements are as follows: a bid bond is mandatory; payment bonds are required for awards exceeding $35,000; and both payment and performance bonds are required for awards over $150,000. Bonds must be submitted within 10 calendar days after contract award. Proposal formatting guidelines specify standard 8½ x 11-inch pages, minimum 12-point font, 1-inch margins, and no elaborate bindings or color presentations.
Interested contractors must be registered and active in the System for Award Management (SAM) at the time of award consideration. The solicitation package includes SF1449, pricing form, clauses and provisions, wage rate determination, statement of work, and four attachments. Wage rates are based on General Wage Rate Decision Number CA20260005 (01/02/2026) for Del Norte, Humboldt, Lake, and Mendocino Counties in California.
A site visit is scheduled for 9:00 AM PST on Tuesday, November 10, 2026. Questions must be submitted via email by 9:00 AM PST on Monday, November 16, 2026, and proposals are due by 1:00 PM PST on Monday, November 30, 2026. All communications, including questions and proposal submissions, should reference the solicitation number and be directed to Terrence Anderson at [email protected] or 682-294-0280.
This opportunity is managed by the FWS Contracting Activity, a federal office, and is currently active. For further details and access to the solicitation documents, contractors may visit the official notice at https://sam.gov/opp/59b915d3ce254949b6a6fda0e1a41bb8/view.
Contractors considering this opportunity should ensure their capabilities align with the technical requirements, licensing, and compliance standards outlined, and be prepared to meet all submission and bonding requirements within the specified timelines.
Documents6