Change Order Notice Metro Ethernet Doc Redundant
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
Doit - Department of Innovation and Technology
Contract Value
Not provided
Codes & Classification
Solicitation Number
27-448DOIT-ADMIN-B-54724
NAICS
-
Classification Code
-
Additional Details
Documents1
The Illinois Department of Innovation and Technology (DoIT) has issued a Change Order Notice pertaining to its existing Metro Ethernet DOC Redundant contract, identified by procurement number 27-448DOIT-ADMIN-B-54724. This amendment is focused on enhancing network capabilities at two critical Department of Corrections (DOC) secondary sites: DOC-R027 Vienna-Secondary, located at 6695 State Route 146 E, Vienna, IL 62995, and DOC-R017 Pinckneyville-Secondary, at 5835 State Route 154, Pinckneyville, IL 62274.
The primary purpose of this change order is to upgrade the bandwidth provisioned at both sites from 100 megabits per second (MB) to 500 MB. This significant increase in bandwidth is intended to support greater data throughput, improve network redundancy, and ensure more robust and reliable connectivity for essential DOC operations. The scope of the amendment is limited to these two locations within the state of Illinois, reflecting a targeted approach to infrastructure enhancement in support of mission-critical state functions.
Key requirements for this procurement activity include the successful implementation of the bandwidth upgrade at both specified sites, ensuring minimal disruption to ongoing operations and compliance with all relevant technical and security standards as set forth by DoIT. The expected deliverable is the fully operational, upgraded Metro Ethernet service at each location, providing a consistent and reliable 500MB connection.
The contracting entity for this procurement is the Illinois Department of Innovation and Technology, a state-level agency responsible for managing and advancing the state’s information technology infrastructure. All work will be performed within Illinois, and the procurement is classified under state-level technology infrastructure improvements. Interested parties can access further details and official documentation via the Illinois BidBuy portal at https://www.bidbuy.illinois.gov/bso/external/bidDetail.sda?docId=27-448DOIT-ADMIN-B-54724&external=true&parentUrl=close.
While the notice does not specify procurement type, set-aside requirements, or special considerations, contractors should be prepared to demonstrate experience with large-scale bandwidth upgrades, familiarity with state government IT environments, and the ability to deliver high-availability network solutions. The contract amendment is expected to remain consistent in its scope and objectives throughout its lifecycle, focusing on the delivery of enhanced, redundant Metro Ethernet connectivity at the designated DOC sites.
For contractors evaluating this opportunity, alignment with the technical requirements and a proven track record in similar state-level IT infrastructure projects will be essential for successful participation.