The United States Department of Agriculture (USDA) Forest Service, through the Payette National Forest office, has issued a combined synopsis/solicitation for the renovation and improvement of the New Meadows Range Barn, located at the New Meadows Barracks administrative site, 100 S Norris Ave., New Meadows, Idaho 83654. This procurement, identified under solicitation number 1240LT27Q0027, is classified under NAICS code 237110 (Water and Sewer Line and Related Structures Construction) and is set aside for Small Business Administration (SBA) eligible contractors.
The primary objective of this project is to enhance the structural integrity, safety, and functionality of the New Meadows Range Barn through a series of targeted construction and abatement activities. The scope of work encompasses both mandatory base tasks and optional work items, with all activities to be performed in compliance with applicable federal, state, and local regulations.
Key requirements and deliverables for the base work include:
1. Roofing Replacement: Complete removal of the existing roofing system, installation of new plywood sheathing over the current skip sheathing, application of an ice/water shield across the entire roof surface, and installation of new corrugated metal roofing to ensure long-term durability and weather resistance.
2. Lead-Based Paint Abatement and Painting: Safe abatement of lead-based paint from rafter tails, soffit, and fascia, followed by the painting of these surfaces to restore and protect the building envelope.
3. Siding Replacement: Removal of existing lead-based paint siding and felt paper, installation of new plywood sheathing and building wrap, and replacement with new siding and trim in-kind around windows, doors, and corners. All new and restored surfaces are to be painted, ensuring both aesthetic improvement and compliance with safety standards.
4. Waterline and Hydrant Modification: Replacement of approximately 10 feet of existing 1-inch SIDR 9 HDPE waterline, relocation of the existing hydrant two feet east along the building, installation of a new hydrant and drainage basin, and replacement of a galvanized barb fitting with a brass barb fitting. These upgrades are intended to improve water service reliability and safety.
Optional work, as detailed in the Schedule of Items, includes the removal of the existing wood decking and foundation piers, and the fabrication and installation of a new expanded metal deck with steps, supported by a metal frame and new foundation piers. This optional component is designed to further enhance the usability and safety of the facility.
The procurement is being managed by the Payette National Forest, a federal office under the USDA Forest Service. The primary point of contact for this opportunity is Derrick A Dodson, who can be reached via email at [email protected]. The solicitation is currently active, with a posting date of October 29, 2026, and responses due by November 29, 2026.
Contractors interested in this opportunity should note the SBA set-aside requirement and ensure their eligibility. The project location is in Idaho, and all work must be performed within the United States. The solicitation and related documents, including seven attachments, are available through the official SAM.gov portal at the provided URL.
This procurement represents a comprehensive effort to modernize and safeguard a key administrative facility within the Payette National Forest, with a focus on structural improvements, environmental safety, and operational reliability. Contractors with experience in waterline construction, roofing, lead abatement, and facility renovation are encouraged to review the full solicitation and consider submitting a proposal.