This presolicitation notice, issued by the Department of Veterans Affairs (VA) through the 247-Network Contract Office 7, announces an upcoming opportunity for certified Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) to participate in a construction project at the Central Alabama Veterans Health Care System, West Campus, located at 215 Perry Hill Road, Montgomery, Alabama. The project, identified as 619-24-103, is titled "Replace Flooring & Repair Walls in Building 1" and is classified under NAICS code 236220 (Commercial and Institutional Building Construction) with a Product Service Code (PSC) of Y1DA (Construction of Hospitals and Infirmaries). The anticipated magnitude of construction is between $1,000,000 and $5,000,000, with a targeted completion period of 365 calendar days from contract award or notice to proceed.
The primary objective of this procurement is to renovate designated interior areas of Building 1 within an active and operational medical facility. The scope of work encompasses the replacement of flooring, repair, refinishing, and painting of walls, installation of new wall-protection systems (including corner guards, handrails, and crash or bumper rails), refinishing of doors and frames, and the replacement of designated water fountains with water cooler and bottle-filling stations, including all associated plumbing connections and restoration of disturbed finishes. The contractor will be responsible for providing all necessary labor, supervision, materials, transportation, infection-control measures, hazardous-materials coordination, and incidentals required to complete the renovation in accordance with construction drawings and specifications.
Given the work will occur in an occupied healthcare environment, the contractor must execute the project in phases to minimize disruption, maintain safe and accessible egress routes, and ensure the protection of patients, staff, and visitors. Strict adherence to infection-control containment, interim life-safety measures, and hazardous-materials protocols is required. The contractor will also be expected to coordinate closely with the Contracting Officer’s Representative and VA personnel, particularly regarding utility interruptions and any disruptive activities. Additional responsibilities include field verification of existing conditions, submission of safety, phasing, infection-control, quality-control, and other required documentation, as well as completion of testing, cleaning, closeout, as-built documentation, warranties, and punch-list corrections. While standard work hours are Monday through Friday, 7:30 a.m. to 4:30 p.m., after-hours and weekend work may be necessary to avoid interfering with hospital operations.
This procurement is a 100% set-aside for certified SDVOSBs. Prospective contractors must be certified and listed in the SBA certification database (search.certifications.sba.gov) and registered in the System for Award Management (SAM) at the time of proposal submission. Joint ventures may be eligible if they comply with the requirements of 13 CFR 128.402 and VAAR Clause 852.219-73. Compliance with VAAR Clause 852.219-75 regarding limitations on subcontracting is mandatory, ensuring that no more than 75% of the contract value (excluding materials) is subcontracted to firms that are not certified SDVOSBs or VOSBs. Contractors must also comply with federal reporting requirements, such as VETS-4212, if applicable.
The contract will be awarded as a Firm Fixed Price Construction contract, and the selection process will utilize a Trade-Off Source Selection methodology to determine the best value for the government. All applicable federal, VA, and departmental acquisition regulations and policies will govern the contract, including the handling of equitable adjustments for any change orders.
The solicitation (36C24727R0009), including all relevant documents, specifications, and drawings, is expected to be posted on or about November 16, 2026, on sam.gov under Contract Opportunities. Interested and qualified SDVOSBs are encouraged to monitor the site for the official Request for Proposal (RFP) and any subsequent amendments, as it is the offeror’s responsibility to stay informed of all updates.
For further information or inquiries, the primary point of contact is Ashley Young, who can be reached via email at [email protected].
This opportunity represents a significant project to enhance the safety, functionality, and aesthetics of a key VA medical facility, and is ideally suited for SDVOSBs with demonstrated experience in healthcare construction, phased renovations, and compliance with stringent safety and infection-control standards.