Request for Information/Market Intelligence Notice: Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA) - Fort Hunter-Liggett Water System Improvements

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

W072 ENDIST LOUISVILLE

Contract Value

Not provided

Codes & Classification
Solicitation Number

W912QR-PDB-FHLWATER

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Classification Code

-

Additional Details
Set Aside

None

Place of Performance

Lockwood, California, UNITED STATES

SourceSAM
Documents1
The U.S. Army Corps of Engineers (USACE), Louisville District, has issued a Request for Information (RFI) and Market Intelligence Notice to assess industry capabilities and gather feedback regarding the potential use of a Progressive Design Build (PDB) approach, executed under Other Transaction Authority (OTA), for comprehensive water system improvements at Fort Hunter Liggett in Lockwood, California. This notice is strictly for market research and informational purposes; it is not a solicitation or request for proposal, and participation is entirely voluntary. **Purpose and Scope** The primary objective of this procurement is to restore and modernize both the potable water and wastewater collection systems throughout the Fort Hunter Liggett Installation. The existing water distribution infrastructure, dating back to the 1950s or earlier, is undersized and exhibits significant operational deficiencies, including insufficient storage capacity, pressure variations, and aging components that have exceeded their useful life. Similarly, the wastewater collection system and treatment lagoons require substantial rehabilitation to address deterioration, operational deficiencies, and code compliance issues. The intended outcome is the delivery of fully functional, modernized potable water and wastewater systems that meet current and future operational, safety, and regulatory requirements. This includes the design and construction of new transmission mains, storage infrastructure (with an estimated minimum of 2 million gallons of storage), upgrades to water supply wells, and comprehensive rehabilitation or replacement of pipelines, valves, hydrants, sanitary sewer lines, manholes, and lagoon liners. Modernization of SCADA components and integration with existing infrastructure is also a key deliverable. **Key Requirements and Deliverables** Contractors will be expected to provide all necessary design services, equipment, materials, labor, construction management, supervision, quality control, and supplies. The project will require: - New water transmission main connecting the well field to the cantonment area - New storage tank farm near security fence gate 10, sized and validated per NSPC, UFC, and NFPA criteria - Upgrades to existing water supply wells for reliability and redundancy - Rehabilitation/replacement of aging pipelines, valves, hydrants, and other distribution assets - Modernization and integration of SCADA systems - Replacement and rehabilitation of sanitary sewer lines, manholes, and lagoon liners - Installation of lagoon baffles to improve wastewater treatment efficiency The estimated acquisition magnitude is between $70 million and $80 million. **Acquisition Strategy** The USACE is evaluating a Progressive Design Build (PDB) strategy utilizing an Other Transaction (OT) Agreement under 10 U.S.C. § 2808a. This authority allows for non-traditional contracting methods to facilitate facility repair and construction, enabling early contractor involvement, commercial pricing transparency, and potential schedule and cost efficiencies. The anticipated selection process is a two-step, qualifications-based approach: 1. Submission of White Papers/Statements of Qualifications 2. Pitch Meetings/Presentations with down-selected firms, leading to negotiations with the most highly qualified design-builder The OT award will be structured in two phases: - **Phase 1 (Design & Pre-Construction):** Collaborative advancement of design, open-book cost estimating, and risk mitigation - **Phase 2 (Construction):** Upon reaching an agreed design level (typically 60–90%), the contractor will propose a Guaranteed Maximum Price (GMP). If accepted, construction proceeds; if not, the government may pursue alternative delivery methods. **Industry Feedback and Participation** The RFI seeks detailed input from interested firms regarding their experience with OTA and collaborative delivery methods, technical expertise in water and wastewater utility construction, risk identification and mitigation strategies, and feedback on the proposed acquisition strategy. Firms are also asked to provide information on bonding capacity and to suggest evaluation criteria that would best differentiate high-performing collaborative design-builders. Responses must be submitted exclusively via the designated online survey form (https://forms.osi.apps.mil/r/Lmjbdft8rU) by November 3, 2026, at 1:00 PM Eastern Time. No other submission methods will be accepted. Firms are encouraged to join the Interested Vendors List on SAM.gov for future updates. **Contracting Entity and Contact Information** - **Contracting Entity:** W072 ENDIST LOUISVILLE (USACE Louisville District) - **Department/Agency:** Department of Defense, Department of the Army - **Place of Performance:** Fort Hunter Liggett, Lockwood, California, USA - **NAICS Code:** 237110 – Water and Sewer Line and Related Structures Construction (2022), Small Business Size Standard: $45 million - **Primary Contact:** Ethan Phillips, [email protected], 502-315-6545 **Special Considerations** - This RFI is not subject to FAR-based small business regulations due to the use of OTA, but NAICS code information is provided for market research purposes. - All responses will be treated as public market research; proprietary or classified information should not be submitted. - The government is particularly interested in candid feedback on commercial practices, risk sharing, governance, pricing, and other factors that could enhance project success under 10 U.S.C. § 2808a. This opportunity is best suited for firms with demonstrated experience in large-scale water and wastewater infrastructure projects, collaborative delivery methods, and the ability to operate under non-traditional contracting authorities. Interested contractors should carefully review the RFI requirements and consider their capacity to deliver innovative, efficient, and compliant solutions for this critical infrastructure modernization effort.