Electric Capital Improvement Project South Oliver Line Rehabilitation Project

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

Elberton, City Of

Contract Value

Not provided

Codes & Classification
Solicitation Number

PE-66412-NONST-2027-000000019

NAICS

-

Classification Code

-

Additional Details
Set Aside

None

Place of Performance

GA

SourceSLED
Documents2
The City of Elberton, Georgia, is soliciting qualified contractors for the Electric Capital Improvement Project—South Oliver Line Rehabilitation Project. This initiative is a critical component of the city’s ongoing efforts to modernize and enhance the reliability of its electric distribution infrastructure. The primary objective of this procurement is to rehabilitate and reconstruct approximately 8,100 linear feet of three-phase primary electrical distribution line, serving a corridor that generally parallels State Highway 77 and Mineral Springs Road. The scope of work encompasses several key activities essential to the successful completion of the project. Contractors will be responsible for the replacement of existing utility poles and the upgrading of current primary conductors to a larger conductor size, thereby increasing the capacity and resilience of the distribution system. In addition to these primary tasks, the selected contractor will provide all necessary labor, equipment, and incidental materials not supplied by the City of Elberton. All construction activities required to complete the project are included within the scope. Strict adherence to industry and safety standards is a fundamental requirement. All work must be performed in accordance with the Electric Cities of Georgia (ECG) distribution construction standards, or equivalent standards as approved in writing by the City’s Electric Distribution Manager. Compliance with the National Electrical Safety Code, OSHA 29 CFR 1926 Subpart V, and 29 CFR 1910.269 is mandatory, ensuring that all construction practices meet or exceed established safety and operational benchmarks. The contracting entity for this opportunity is the City of Elberton, a state government organization located in Georgia. Interested contractors should note that the procurement is posted under the identifier PE-66412-NONST-2027-000000019. The official notice and all related documents can be accessed via the Georgia Procurement Registry at https://ssl.doas.state.ga.us/gpr//eventDetails?eSourceNumber=PE-66412-NONST-2027-000000019&sourceSystemType=gpr20. The procurement timeline indicates a posting date of October 23, 2026, with responses due by December 2, 2026. While the notice does not specify set-aside requirements or special considerations, all prospective bidders are expected to demonstrate experience with similar electric distribution projects and a proven track record of compliance with relevant codes and standards. This project represents a significant opportunity for contractors specializing in electric utility construction and rehabilitation. The work will have a lasting impact on the reliability and efficiency of Elberton’s electric distribution system, supporting the city’s commitment to providing safe and dependable electric service to its community.