Change Order Notice 1St Amendment Rr-24-4977 Jane Addams Mem Tllwy I-90 Brdg Repr Rockton Rd to Rote
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
Tha - Toll Highway Authority
Contract Value
Not provided
Codes & Classification
Solicitation Number
27-557THA-ENGCO-B-54590
NAICS
-
Classification Code
-
Additional Details
Documents1
This notice pertains to the issuance of Change Order Notice 1st Amendment RR-24-4977, related to the Jane Addams Memorial Tollway (I-90) bridge repair project, specifically covering the segment from Rockton Road to Rote in Illinois. The procurement activity is managed by the Illinois Toll Highway Authority (THA), a state-level contracting entity responsible for the oversight and maintenance of tollway infrastructure within Illinois.
The primary purpose of this notice is to inform stakeholders of an amendment to an existing contract, rather than to solicit new bids or proposals. As such, this is not a solicitation for new work, but rather a formal notification of a change order affecting the scope, terms, or conditions of the ongoing bridge repair project along the I-90 corridor. The amendment likely addresses modifications to the original contract, which may include adjustments to project deliverables, timelines, or other contractual obligations, although specific details of the amendment are not provided in the notice.
The scope of the underlying project involves bridge repairs on the Jane Addams Memorial Tollway, a critical transportation artery in Illinois, between Rockton Road and Rote. The intended outcome is to ensure the continued safety, functionality, and longevity of the tollway’s bridge infrastructure in this region. Contractors involved in this project are expected to deliver high-quality repair work in accordance with the standards and requirements set forth by the Illinois Toll Highway Authority.
Key details for contractors and interested parties include:
- Contracting Entity: Illinois Toll Highway Authority (THA)
- Place of Performance: Illinois (IL)
- Procurement Identifier: 27-557THA-ENGCO-B-54590
- Notice Type: Change Order/Amendment (not a new solicitation)
- Notice Source: BIDMATCH_SLED
- Notice and SLED URLs: [BidBuy Notice](https://www.bidbuy.illinois.gov/bso/external/bidDetail.sda?docId=27-557THA-ENGCO-B-54590&external=true&parentUrl=close)
- Department: THA Toll Highway Authority
No information is provided regarding set-aside requirements, procurement classification codes, or special considerations such as DBE/MBE participation or bonding requirements. The notice does not include technical specifications, amendment details, or documentation attachments.
Contractors currently engaged in or monitoring this project should review the amendment details as provided by the Illinois Toll Highway Authority to understand any changes to their contractual obligations. As this is a change order notice, the fundamental elements of the project—bridge repair on I-90 between Rockton Road and Rote—remain constant, with the amendment serving to clarify or adjust specific aspects of the contract as determined by the Authority.
For further information or to access the full amendment documentation, interested parties should refer to the official BidBuy notice link provided above.