ITB No. 26-2999-9EAR - Fair Oaks Elementary School...

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

Henrico County Government

Contract Value

Not provided

Codes & Classification
Solicitation Number

IFB 130442-1

NAICS

-

Classification Code

-

Additional Details
Set Aside

None

Place of Performance

-

SourceSLED
Henrico County Government has issued Invitation to Bid (ITB) No. 26-2999-9EAR, identified as IFB 130442-1, for a construction project at Fair Oaks Elementary School, located at 201 Jennings Road, Highland Springs, VA 23075. The primary objective of this procurement is to replace the existing closed circuit cooling tower, circulation pumps, and associated piping at the school. The scope of work also encompasses all related electrical and controls work as detailed in the contract documents. A notable requirement of this project is that the controls must be provided by Automated Logic Contracting Services, Inc., as specified under Allowance No. 1. This stipulation ensures consistency and compatibility with existing systems or standards set by the county. Contractors should be prepared to coordinate with Automated Logic for the controls portion of the work. The procurement is managed by Henrico County Government, a state-level entity in Virginia. All work will be performed at the specified school location in Highland Springs, VA. The notice does not specify any set-aside requirements or special procurement types, nor does it indicate any particular socioeconomic or small business preferences. Interested contractors should note the following key dates: the notice was posted on October 20, 2026, and responses are due by November 17, 2026. All relevant project details, including contract documents and further instructions, can be accessed through the official Henrico County procurement portal at https://mvendor.cgieva.com/Vendor/public/IVDetails.jsp?PageTitle=SO%20Details&rfp_id_lot=130442&rfp_id_round=1. This opportunity is well-suited for contractors with experience in mechanical system replacements, particularly those familiar with cooling tower systems, pump installations, and integration of building controls. The project will require close adherence to the provided specifications and coordination with the designated controls provider. Contractors should ensure they have the capacity to manage both the mechanical and electrical aspects of the work, as well as the ability to comply with all county and state requirements throughout the contract lifecycle.