WY BR WYAO US20(1) US 20 and Hayden Arch Bridge Repairs
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
6982AF CENTRAL FEDERAL LANDS DIVISI
Contract Value
Not provided
Codes & Classification
Solicitation Number
6982AF27SS00001
NAICS
237310 - Highway, Street, and Bridge Construction
Classification Code
Y1LB
Additional Details
The Federal Highway Administration (FHWA), through its Central Federal Lands Division, has issued a Sources Sought notice to assess the interest and qualifications of potential prime contractors for the upcoming WY BR WYAO US20(1) US 20 and Hayden Arch Bridge Repairs project. This notice is not a solicitation for bids; rather, it is a market research tool to determine the availability of qualified small business concerns—including HUBZone, woman-owned, 8(a), and service-disabled veteran-owned small businesses—that are interested in and capable of performing the required work as prime contractors. The information gathered will inform the agency’s decision regarding potential set-aside opportunities for these socioeconomic categories.
The project is located near Cody, Wyoming, specifically on Hayden Arch Road approximately five miles west of the city. The Hayden Arch Bridge, which spans the Shoshone River at an elevation of about 5,060 feet, provides critical access to the Bureau of Reclamation’s Buffalo Bill Dam Power Plant. The scope of work encompasses comprehensive repairs to the Hayden Arch Bridge and its approaches, with the intent to restore structural integrity, improve safety, and extend the service life of the bridge and associated roadway infrastructure.
Key elements of the project include:
- Reconstruction of bridge approaches
- Minor drainage improvements
- Installation of new signage and replacement of guardrails
- Bridge repairs addressing concrete spalls, cracks, delamination, and patching in both the superstructure and deck
- Installation of a waterproofing membrane on the bridge deck
- Construction of a temporary debris shield beneath the bridge
Principal work items are detailed as follows:
- Soil erosion control (LPSM)
- Placement of 310 tons of roadway aggregate (Method 2)
- Installation of 350 tons of asphalt concrete pavement (Type 1)
- Application of 445 square yards of membrane waterproofing
- Construction of a debris shield (LPSM)
- Deep concrete repairs totaling 38 square yards, with additional deep and full-depth bridge deck repairs totaling 160 square yards
- Installation of 520 linear feet of 12-inch depth concrete curb
- Installation of 263 linear feet of steel post guardrail system (Type 2, Class A)
The bridge will be closed to public traffic for the duration of construction to ensure safety and facilitate efficient project execution. The anticipated project schedule is as follows: advertisement in January 2027, contract award in March 2027, notice to proceed in April 2027, and contract completion by October 2027. The total construction duration is expected to be 120 days. The estimated cost range for the project is between $2,000,000 and $5,000,000.
Interested firms must demonstrate their intent and capability to perform as a prime contractor by submitting: (1) a statement of intent to bid, (2) confirmation of applicable socioeconomic status, (3) a bonding agent’s letter verifying the ability to bond a single project of $5 million and aggregate bonding capacity, and (4) a list of relevant road construction projects of similar value and scope, specifically those involving bridge approach reconstruction, drainage improvements, signage, guardrail replacement, and the specified bridge repair techniques. Only projects that include all these elements should be submitted for consideration.
The procurement is classified under NAICS code 237310 (Highway, Street, and Bridge Construction), with Product Service Code Y1LB. All interested firms must be registered in the System for Award Management (SAM) and comply with SBA regulations regarding business size and affiliation.
The contracting entity for this opportunity is the Central Federal Lands Division of the Federal Highway Administration, Department of Transportation. The primary point of contact is Laura Slauter ([email protected]), with Jorey Deml as the secondary contact at the same email address. Responses are due by 2:00 p.m. local Denver time on November 4, 2026.
This opportunity is ideal for contractors with proven experience in complex bridge and roadway rehabilitation projects, particularly those with the capacity to manage specialized concrete repairs, waterproofing, and traffic control in remote or environmentally sensitive locations. Firms meeting the outlined requirements and interested in pursuing this work are encouraged to respond in accordance with the notice instructions.
For further details and updates, refer to the official notice at: https://sam.gov/opp/af5068b71a8c46d092c4758da29a1c7a/view