The Department of the Air Force, through the 78th Civil Engineer Group at Robins Air Force Base (AFB) in Warner Robins, Georgia, has issued a Special Notice (FA8501-27-RAPID-PAVE-OTA) seeking industry participation under the Robins Agile Practices for Infrastructure Development (RAPID) framework. This procurement is conducted pursuant to 10 U.S.C. § 2808a and is structured as an anticipated Other Transaction Agreement (OTA) for the restoration, modernization, and sustainment of critical airfield infrastructure at Robins AFB.
**Purpose and Scope**
The primary objective of this procurement is to obtain commercially viable, safe, and schedule-credible solutions to restore and sustain airfield infrastructure essential for safe aircraft movement, installation readiness, and ongoing mission operations. The scope encompasses comprehensive construction and repair activities targeting airfield pavement, runway overruns, taxiways, drainage systems, pavement markings, and associated supporting work. The intended outcome is to deliver a safe, reliable, and mission-ready airfield environment that minimizes operational disruptions and effectively manages construction, safety, environmental, and schedule risks.
**Project Areas and Requirements**
The project is divided into several key areas, each with specific requirements:
1. **Runway 3901 Pavement and Shoulders (UHHZ210404):** Restoration of pavement slabs, shoulders, and markings to ensure a safe and serviceable runway.
2. **South Runway Overrun (UHHZ210404):** Replacement or restoration of the south runway overrun and related infrastructure, with a focus on sequencing, access, staging, safety, and minimizing operational disruption.
3. **South Overrun Contingency Work (UHHZ210404):** Potential additional work in the south overrun area, with respondents required to outline assumptions, cost and schedule impacts, and technical dependencies.
4. **Taxiway C, Facility 3931 (UHHZ150412):** Repair of Taxiway C to restore reliable aircraft ground movement, including considerations for phasing, operational coordination, quality control, and turnover.
5. **Drainage and Storm-Drain Disposal, Facility 8700 (UHHZ160138):** Correction of drainage deficiencies, addressing water management, constructability, site access, environmental controls, and integration with related airfield work.
The work environment is characterized by ongoing airfield operations, access restrictions, and construction staging limitations, requiring careful coordination to maintain partial or full operational status of the runway and taxiways during project execution.
**Procurement Approach**
This opportunity is issued as an Area of Interest (AOI) under the RAPID umbrella, utilizing a Build-Only execution model. The Government will provide a 100% completed design package and specific phasing and repair requirements, eliminating the need for a collaborative design-builder phase. The OTA structure is intended to expedite construction execution and reduce administrative procurement delays.
**Selection Process and Submission Requirements**
The Government will employ a two-step, best-value selection process:
- **Step 1:** Evaluation of written Phase 1 Solution Briefs to establish a shortlist of highly qualified firms. Price is not evaluated at this stage.
- **Step 2:** Shortlisted firms will participate in interactive pitch presentations/interviews and submit a formal price proposal. Final selection will be based on a best-value tradeoff between technical and price factors.
**Phase 1 Solution Briefs** must be submitted by 3:00 PM Eastern Standard Time on or before October 30, 2026, and are limited to five written pages (excluding the cover page). Submissions must include:
- Cover page with company and contact information
- Executive summary, team composition, and organizational structure
- Demonstration of at least five years of relevant construction experience, particularly on government runway/taxiway projects
- Statement of financial capacity and bonding (including surety information)
- Construction execution and phasing approach, including understanding of the provided design and schedule realism
**Evaluation Criteria**
Key evaluation factors include:
- **Past Relevant Construction Experience:** Minimum five years on comparable projects, with emphasis on work in occupied, restricted, or operational environments and adherence to safety and environmental standards.
- **Team Composition and Organization:** Adequacy of organizational structure and qualifications of key personnel (Project Manager, Site Superintendent, Site Safety and Health Officer, Quality Control Manager).
- **Construction Execution and Phasing Approach:** Technical understanding of the design, execution methodology, utility coordination, and schedule feasibility.
- **Financial Capacity and Bonding:** Ability to support a project magnitude estimated between $58M and $108M, with sufficient bonding capacity as required.
During Step 2, additional focus will be placed on constructability review, risk management, collaborative execution, and problem-solving capabilities.
**Contracting Entity and Contact Information**
- **Contracting Entity:** FA8501 OPL CONTRACTING AFSC/PZIO, Department of the Air Force, Department of Defense
- **Place of Performance:** Robins Air Force Base, Warner Robins, Georgia, United States
- **NAICS Code:** 237310 (Highway, Street, and Bridge Construction)
- **Primary Contact:** Arenina Sullivan-Jones ([email protected])
- **Secondary Contact:** Jada Releford ([email protected])
**Special Considerations**
- This notice is not a solicitation for bids or proposals under the Federal Acquisition Regulation and does not commit the Government to award.
- The applicability of Davis-Bacon, prevailing wage, and other labor requirements will be addressed during the pitch phase or prior to award.
- The Government reserves the right to modify, suspend, or cancel the notice, conduct technical exchanges, request clarifications, and make no award.
**Attachments**
A suite of technical documents and templates is provided, including Statements of Objectives, pavement condition ratings, best management practices, drainage drawings and specifications, submittal registers, and a blank bid schedule.
**Summary for Contractors**
This opportunity is well-suited for firms with demonstrated experience in large-scale airfield construction and repair, particularly those with a track record of working in operational, secure, and logistically constrained environments. The project requires robust financial and bonding capacity, a highly qualified project team, and the ability to execute complex construction activities with minimal disruption to ongoing airfield operations. Interested parties should carefully review the provided documentation and prepare concise, well-organized solution briefs that clearly address the outlined requirements and evaluation criteria.
For further details and to access the full notice and attachments, visit the official SAM.gov opportunity page: https://sam.gov/opp/89872f0fe714432fae7a92e28c292857/view
Documents12