Float Well Pipe Repairs, Surry Mountain Dam, Surry, NH

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

W2SD ENDIST NEW ENGLAND

Contract Value

Not provided

Codes & Classification
Solicitation Number

W912WJ27X1CTD

NAICS

237990 - Other Heavy and Civil Engineering Construction

Classification Code

-

Additional Details
Set Aside

None

Place of Performance

Surry, New Hampshire, UNITED STATES

SourceSAM
The U.S. Army Corps of Engineers, New England District, is conducting a market research effort through this Sources Sought Announcement to identify qualified small business concerns—including 8(a), HUBZone, Service-Disabled Veteran-Owned, Women-Owned, and other Small Businesses—for an upcoming construction project at the Surry Mountain Dam in Surry, New Hampshire. The primary objective of this procurement is to secure construction services for the repair of the inlet pipe to the float well and the replacement of weathered or damaged staff gauges at the Surry Mountain Lake Dam. The scope of work encompasses several specialized tasks at the inlet culvert on the lake side of the dam. Key requirements include the installation of a coffer dam at the inlet pipe location, cleaning of a 3-inch cast iron float well pipe, installation of an internal liner within the float well pipe, and conducting closed-circuit television (CCTV) inspections both before and after liner installation. Additional work involves repairs to the slash-zone pipe segment, protection and concrete encasement of the external float well pipe, and the replacement of staff gauges with pressure-treated posts and enamel-coated metal measuring strips. The project is anticipated to be solicited in the winter of 2026, with construction activities scheduled to commence in the summer of 2027. The estimated construction cost is between $350,000 and $500,000. Contractors should note that the timing of the work is dependent on the depth of the pool at Surry Mountain Lake, with low pool depths typically occurring in July and August. However, adverse weather conditions, such as rain events, may impact the work schedule. Coordination with Surry Mountain staff will be necessary to monitor pool levels and determine the optimal window for construction activities. This notice is classified under NAICS code 237990 (Other Heavy and Civil Engineering Construction), with a size standard of $45 million. The contracting entity is the New England District of the U.S. Army Corps of Engineers (W2SD ENDIST NEW ENGLAND), operating under the Department of the Army, Department of Defense. The place of performance is Surry, New Hampshire. Interested firms are requested to submit a capabilities package that includes their business classification, relevant qualifications, and experience in performing the specified work components. Submissions should provide at least two examples of similar projects completed within the past seven years, including the experience and qualifications of any proposed subcontractors. Proof of bonding capability is also required. Responses are limited to twenty pages and must be submitted in both original and copy formats. The deadline for submission is November 23, 2026. This announcement is for informational and planning purposes only; it does not constitute a solicitation or a request for proposal. The information gathered will be used to assess the interest and capabilities of potential contractors and will remain valid for one year from the date of the notice. No reimbursement will be made for any costs associated with responding to this market survey. For further information or to submit a response, interested parties should contact Kyle Hall at [email protected] or by phone at (978) 318-8479. Additional details about the New England District of the U.S. Army Corps of Engineers can be found at www.nae.usace.army.mil. This opportunity is particularly well-suited for small businesses with demonstrated experience in heavy and civil engineering construction, especially those with expertise in dam infrastructure repairs, pipe rehabilitation, and water level management in active reservoir environments.