Change Order Notice I-25-2005 Rm Tollway (I-88), Bridge Recon at Cnr, Phase Ii Engineering Services
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
Tha - Toll Highway Authority
Contract Value
Not provided
Codes & Classification
Solicitation Number
27-557THA-ENGCO-B-54543
NAICS
-
Classification Code
-
Additional Details
Documents1
The Illinois Toll Highway Authority (THA) has issued a Change Order Notice for contract I-25-2005, pertaining to the RM Tollway (I-88) and specifically focused on bridge reconstruction at the CNR location. This procurement seeks Phase II Engineering Services, which typically encompass detailed design, preparation of construction documents, and support services necessary to advance the bridge reconstruction project from preliminary concepts through to construction readiness.
The primary objective of this procurement is to secure professional engineering expertise to ensure the successful planning and execution of bridge rehabilitation or replacement activities along the I-88 corridor. The scope of work is expected to include, but may not be limited to, comprehensive engineering analysis, development of construction plans and specifications, coordination with relevant stakeholders, and provision of technical support throughout the project lifecycle. The intended outcome is to facilitate a safe, efficient, and timely reconstruction of the identified bridge structure, thereby enhancing the reliability and safety of the RM Tollway infrastructure.
This opportunity is managed by the Illinois Toll Highway Authority, a state-level entity responsible for the oversight and maintenance of tollway infrastructure within Illinois. The place of performance is within the state of Illinois (IL), and all work will be conducted in accordance with state and agency standards. The procurement is identified under the code 27-557THA-ENGCO-B-54543.
Interested contractors should note that this is a change order notice, which may indicate modifications to an existing contract or scope of work. The notice does not specify set-aside requirements or special considerations such as small business preferences or disadvantaged business enterprise goals. Contractors are encouraged to review the official solicitation documents for further details regarding eligibility, submission requirements, and evaluation criteria.
Key dates for this procurement include a posting date of October 20, 2026, and a response deadline of November 20, 2026. All official documentation and updates are available through the Illinois BidBuy procurement portal, accessible via the provided URLs.
This procurement represents a significant opportunity for firms with demonstrated experience in bridge engineering and transportation infrastructure projects, particularly those familiar with Illinois state standards and tollway operations. Contractors should ensure their capabilities align with the anticipated scope of Phase II Engineering Services and be prepared to deliver high-quality, timely, and compliant deliverables in support of the Illinois Toll Highway Authority’s mission.