Drc-27F414 Socf Main Switch and Distribution - Ae Rfq
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
Sfc-Oh Facilities Construction Com
Contract Value
Not provided
Codes & Classification
Solicitation Number
SRC0000042501
NAICS
-
Classification Code
-
Additional Details
The State of Ohio, through the SFC-OH Facilities Construction Commission, has issued a Request for Qualifications (RFQ) titled "DRC-27F414 SOCF Main Switch and Distribution - AE RFQ" (Solicitation ID: SRC0000042501). This procurement seeks to identify qualified architectural and engineering (AE) firms for the main switch and distribution project at the Southern Ohio Correctional Facility (SOCF). The solicitation is managed via OhioBuys, the state's procurement platform.
**Purpose and Scope:**
The primary objective of this RFQ is to engage AE professionals for the design and oversight of electrical infrastructure upgrades, specifically focusing on the main switch and distribution systems at SOCF. The scope encompasses all necessary professional services required to ensure the successful planning, design, and implementation of the project, adhering to state standards and facility requirements.
**Procurement Details and Process:**
- **Procurement Type:** Request for Qualifications (RFQ), utilizing a Qualifications Based Selection (QBS) process. This means firms will be evaluated and selected based on their demonstrated qualifications, experience, and capacity to deliver the required services, rather than price alone.
- **Solicitation Status:** The opportunity is currently open for bidding.
- **Lot and Round:** This solicitation is for Lot #1, Round #1.
- **Timeline:**
- **Begin Date:** October 15, 2026, at 1:00 PM (ET)
- **Inquiry End Date:** November 16, 2026, at 12:00 PM (ET)
- **Response Due Date:** November 20, 2026, at 3:00 PM (ET)
- **Amendment Status:** The solicitation is not marked as an amendment.
- **MBE Set-Aside:** This RFQ is not designated as a Minority Business Enterprise (MBE) set-aside; all qualified firms may respond.
**Key Requirements and Deliverables:**
While the notice does not provide a detailed project summary or technical requirements, it is clear that the selected AE firm will be responsible for delivering comprehensive design and engineering services for the electrical main switch and distribution system. Respondents should be prepared to demonstrate relevant experience with similar facility infrastructure projects, compliance with state construction standards, and the ability to manage the project lifecycle from concept through completion.
**Solicitation Documents:**
Two primary documents are available for review and download:
- AE RFQ DRC 27F414 REV 1.pdf
- Updated-AE Exhibit A Standard Terms and Conditions - 2025-OCT.pdf
These documents contain the official RFQ details and the standard terms and conditions applicable to the engagement. Interested firms are encouraged to review these materials thoroughly to understand the full scope, submission requirements, and contractual obligations.
**Contracting Entity and Location:**
- **Contracting Entity:** SFC-OH Facilities Construction Commission (State of Ohio)
- **Department:** SFC OH Facilities Construction Com
- **Place of Performance:** Ohio (OH)
- **Notice URL:** [OhioBuys Solicitation Page](https://ohiobuys.ohio.gov/page.aspx/en/bpm/process_manage_extranet/58718)
**Constant Elements Throughout Contract Lifecycle:**
- The engagement will be governed by the State of Ohio’s procurement and contracting standards.
- The project location and contracting entity will remain unchanged.
- The RFQ process will adhere to Qualifications Based Selection principles.
- Standard terms and conditions, as outlined in the provided documents, will apply.
**Special Considerations:**
- No set-aside or special certification requirements are indicated for this solicitation.
- The opportunity is open to all qualified AE firms with relevant experience.
- All communication and document submission will be managed through OhioBuys.
**Summary for Contractors:**
This RFQ represents a significant opportunity for AE firms specializing in electrical infrastructure for correctional facilities or similar institutional environments. Firms should ensure their qualifications align with the project’s requirements and be prepared to submit comprehensive documentation demonstrating their expertise, capacity, and compliance with state standards. The procurement is managed by a state entity, and all contractual and procedural requirements will reflect Ohio’s public sector norms.
For further information, access the solicitation documents and respond via the OhioBuys platform by the specified deadline.