FCI Sheridan Water Loop Repair
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
FCI SHERIDAN
Contract Value
Not provided
Codes & Classification
Solicitation Number
15B61227Q00000001
NAICS
237110 - Water and Sewer Line and Related Structures Construction
Classification Code
Z2ND
Additional Details
Documents2
The Federal Bureau of Prisons, through the Federal Correctional Institution (FCI) Sheridan, has issued a solicitation (No. 15B61227Q00000001, Project No. 26Z6AV4) seeking firm-fixed-price quotations for the repair of the underground pre-insulated hot-water distribution loop at its facility located at 27072 SW Ballston Road, Sheridan, Oregon 97378. This procurement is classified under NAICS code 237110 (Water and Sewer Line and Related Structures Construction) and is set aside exclusively for small businesses, in accordance with SBA requirements.
The primary objective of this project is to restore the integrity and functionality of the facility’s underground hot-water distribution system at designated Locations A and B. The scope of work encompasses a comprehensive range of activities, including but not limited to: structural pipe lining, mechanical repairs, excavation, hydrostatic testing, leak-detection continuity, insulation and surface restoration, and the implementation of temporary hot-water contingency measures to minimize disruption to facility operations. Contractors are expected to provide all necessary labor, supervision, technical engineering, equipment, materials, and incidentals required to complete the repairs in accordance with the Statement of Work (SOW) and associated drawings, which are integral to the solicitation and any resulting contract.
Key requirements for this procurement include the submission of a firm-fixed-price quotation for the complete requirement (CLIN 0001), inclusive of security coordination, testing, restoration, warranties, and temporary hot-water solutions as specified in the SOW. Offerors must also provide a detailed technical narrative (not exceeding five pages) that addresses their proposed repair approach and sequence for both locations, the suitability and installation procedures for the structural liner, and the manufacturer’s warranty. The narrative should further detail the contractor’s plan for excavation, welding, insulation restoration, testing, and surface restoration, as well as a proposed completion schedule that accounts for mobilization, personnel clearances, material availability, system shutdowns, and testing. A critical operational constraint is the eight-consecutive-hour hot-water outage limit per housing unit, necessitating a robust temporary boiler contingency plan.
Additionally, contractors are required to describe up to three relevant projects involving underground hot-water piping repairs or high-temperature structural pipe lining, specifying the scope, completion date, customer contact information, and their role as either prime or subcontractor. This information will be evaluated separately from the technical narrative.
A distinctive feature of this procurement is the requirement for a virtual oral presentation by each quoter, during which the proposed project manager or technical lead must explain the repair approach, schedule, outage management, contingency planning, and principal performance risks. The Government will evaluate both the written and oral submissions, with technical approach and relevant experience/past performance weighted more heavily than price in the best-value determination.
The evaluation process will assign confidence ratings (High, Some, or Low) to both the technical approach and relevant experience/past performance, based on the Government’s assessment of the quoter’s understanding, feasibility of approach, material suitability, and demonstrated ability to meet all technical, security, and schedule requirements. Price will be evaluated for completeness, fairness, and reasonableness. The Government reserves the right to make an award without discussions, so quoters are encouraged to submit their best initial offer.
Quotations are due by October 29, 2026, at 8:30 a.m. Pacific Time, and must be submitted electronically to Daryn Palmer at [email protected], with the solicitation number clearly identified in the subject line. Any amendments to the solicitation must be acknowledged in the submission. For additional information, David Bryant ([email protected]) is listed as a secondary contact.
This opportunity is well-suited for small business contractors with demonstrated experience in underground hot-water piping systems, structural pipe lining, and institutional construction environments requiring strict security coordination and operational continuity. The project’s requirements, evaluation criteria, and submission instructions are clearly delineated in the solicitation and its attachments, providing a comprehensive framework for interested contractors to assess alignment with their capabilities and experience.