Notice to Construction Community: USACE RMS to CMP Transition
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
US ARMY CORPS OF ENGINEERS
Contract Value
Not provided
Codes & Classification
Solicitation Number
RMS_to_CMP_USACE
NAICS
-
Classification Code
-
Additional Details
The U.S. Army Corps of Engineers (USACE), a major command within the Department of the Army under the Department of Defense, has issued a Special Notice to inform the construction community of an upcoming transition from the current Resident Management System (RMS) to the new Construction Management Platform (CMP). This transition will be implemented through a phased deployment, scheduled to occur between January 2027 and September 2027, and will affect contracts performed within the United States.
The primary purpose of this notice is to provide advance information regarding the change in construction management systems and associated specifications. The transition aims to modernize and streamline construction management processes across USACE projects by adopting the CMP, which will eventually supersede the RMS as the governing platform for contract administration and project oversight.
This notice is strictly informational and does not alter the terms, conditions, or specifications of any current contracts. However, USACE is actively reviewing existing contracts to identify those that may require modification to incorporate the CMP Specification. Contractors are advised to direct any contract-specific inquiries to their assigned Contracting Officer or Contracting Office Representative.
Key requirements and objectives of this transition include:
- Ensuring that all contracts adhere to the appropriate specification based on the system in use. The RMS Specification (UFGS 01 45 00.15 10) will remain in effect until the official transition date and the effective date of the relevant contract modification for CMP deployment. Once a district is deployed to CMP and the corresponding contract modification is effective, the CMP Specification (UFGS 01 45 00.25 10) will govern.
- Providing resources and reference materials to facilitate a smooth transition. Contractors are encouraged to review the official specifications and consult the USACE CMP Information Portal (CMA²) for the latest updates, system training, and additional guidance.
Relevant links for further information include:
- CMP Specification: [UFGS 01 45 00.25 10](https://www.wbdg.org/dod/ufgs/ufgs-01-45-00-25-10)
- RMS Specification: [UFGS 01 45 00.15 10](https://www.wbdg.org/dod/ufgs/ufgs-01-45-00-15-10)
- CMP Information Portal: [CMA² - USACE CMP Information Portal](https://cm-usace.erdc.dren.mil/article/8c7d854a-cdcd-44b7-a039-e2cd393133cc)
The contracting entity for this initiative is the US Army Corps of Engineers, with the Construction Management Technology Modernization Office (CM TMO) serving as the primary point of contact. Inquiries can be directed to [email protected].
This notice does not represent a solicitation or procurement action and does not include set-aside requirements or special considerations. It is intended to keep contractors informed of forthcoming changes that will impact contract administration and compliance requirements over the contract lifecycle. Contractors are encouraged to stay informed and prepare for the transition by reviewing the provided resources and maintaining communication with their USACE contacts.
For additional details and ongoing updates, contractors should refer to the official notice on SAM.gov (Opportunity ID: 60d98dc9a51a4f62959b27f470fa98a9).