REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICE RELATED TO SEVERAL UPCOMING PROJECTS at WRIGHT-PATTERSON AFB, OHIO

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

W072 ENDIST LOUISVILLE

Contract Value

Not provided

Codes & Classification
Solicitation Number

W912QR26_RFI_CONSOLIDATEDPROJECTS_WPAFB

NAICS

236220 - Commercial and Institutional Building Construction

Classification Code

-

Additional Details
Set Aside

None

Place of Performance

Wright Patterson AFB, Ohio, UNITED STATES

SourceSAM
The U.S. Army Corps of Engineers (USACE), Louisville District, in support of the United States Air Force (USAF), has issued a Request for Information (RFI) and market research notice seeking industry input for several significant upcoming construction and renovation projects at Wright-Patterson Air Force Base (WPAFB), Ohio. This notice, posted under procurement identifier W912QR26_RFI_CONSOLIDATEDPROJECTS_WPAFB, is strictly for informational and market research purposes; it does not constitute a solicitation or request for proposal, and participation is voluntary with no obligation or reimbursement by the Government. **Purpose and Scope** The RFI aims to identify qualified and interested industry partners capable of delivering complex design and construction services for a diverse portfolio of projects at WPAFB. The projects span secure facility renovations, advanced laboratory construction, modernization of research infrastructure, decentralization of heating systems, dormitory repairs, and comprehensive upgrades to research environments. The Government is particularly interested in innovative approaches, emergent construction technologies, and delivery methodologies that enhance mission resilience, installation support, and cost/schedule efficiency. **Project Overviews and Estimated Magnitudes** 1. **Renovate NASIC Main Campus, Phase 1 (F/10853):** Full renovation of 170,000 SF of Sensitive and Special Access Program spaces, including interior demolition, replacement of architectural and MEP systems, roof and envelope modifications, cybersecurity measures, and construction of a corridor bridge. Estimated magnitude: ~$160M. 2. **Advanced Materials Research Laboratory – C2A:** Construction of a new 90,000 SF, three-story laboratory and research facility, potentially including a central utility plant. Work involves structural, mechanical, and electrical systems, precision HVAC, fire protection, and site improvements. Estimated magnitude: ~$122M. 3. **Compressor Research Facility Systems Modernization:** Replacement of legacy drive and power equipment with a new 30,000-horsepower Variable Frequency Drive system, including demolition, system integration, commissioning, and training. Estimated magnitude: $25M. 4. **Consolidate/Demo F/31240:** Decentralization of Area A heating by replacing the aging HTHW system with standalone boiler plants for 49 facilities, including demolition, installation of new systems, and site restoration. Estimated magnitude: $66.5M. 5. **Consolidate/Demo West Ramp:** Decentralization of heating for the West Ramp area, replacing the HTHW system with standalone boiler plants for 15 facilities, including demolition, renovations, and upgrades. Estimated magnitude: $14M. 6. **Repair Dormitory Multi-Facility (F/31212 & F/31213):** Comprehensive repairs and modernization of two dormitories, focusing on sustainment, infrastructure upgrades, code compliance, and hazardous material remediation. Estimated magnitude: $25M (total). 7. **Renovate Research Facility (F/20490):** Renovation of the North and South Wings of a 60,000 SF aerospace research facility, including interior reconfiguration, system upgrades, code compliance, and environmental coordination. Estimated magnitude: ~$22M. **Acquisition Strategy and Delivery Method** The Government is considering the use of **Other Transaction (OT) Agreements** under 10 U.S.C. § 2808a for each project. This authority supports military construction projects involving testing and experimentation with new technologies or delivery methods. The baseline delivery method is **Progressive Design-Build (PDB)**, which involves: - **Phase 1 (Design & Pre-Construction):** Collaborative advancement of design, constructability reviews, open-book cost estimating, and risk mitigation. - **Phase 2 (Construction):** Upon reaching an agreed design level (60–90%), the Awardee proposes a Guaranteed Maximum Price (GMP). If accepted, construction proceeds; if not, the Government may pursue alternative methods. **Key Requirements and Objectives** - Compliance with **NAICS Code 236220** (Commercial and Institutional Building Construction) for market research purposes. - Potential **Cybersecurity Maturity Model Certification (CMMC)** requirements for projects involving Controlled Unclassified Information (CUI) and Federal Contract Information (FCI). Offerors must have an active SAM registration and a verified confidence level assessment in SPRS per NIST SP 800-171. - Demonstrated experience in secure facility construction (ICD 705), complex MEP infrastructure, occupied renovations, robust communications systems, and laboratory equipment integration. - Innovative technologies, sustainable building practices, and modern construction processes are highly encouraged. - Ability to manage subcontractor integration, open-book pricing, risk allocation, and phased bonding structures. **Submission Instructions and Contact Information** Interested firms should submit responses in PDF format (max 15 pages, excluding brochures/profiles) by **02 November 2026, 12:00 P.M. Eastern Time**. Submissions and inquiries should be directed to: - **Primary Contact:** Mr. Jacob Pridemore - **Email:** [email protected] - **Phone:** 502-315-6228 **Contracting Entity and Location** - **Contracting Entity:** W072 ENDIST LOUISVILLE (USACE Louisville District) - **Department:** Department of Defense, Department of the Army - **Place of Performance:** Wright-Patterson Air Force Base, Ohio, United States **Special Considerations** - This RFI is not subject to FAR-based small business regulations, but socioeconomic status information is requested for market research. - Participation in the RFI does not affect eligibility for future solicitations. - No set-aside requirements are specified at this stage. - The Government will not reimburse costs associated with RFI responses. **Constant Elements Over Contract Lifecycle** - The projects are located at WPAFB, Ohio, and will be managed by USACE Louisville District. - The NAICS classification and focus on commercial/institutional building construction will remain. - The use of OT Agreements and Progressive Design-Build methodology is central to the acquisition strategy. - Cybersecurity and CMMC compliance will be required for projects involving CUI/FCI. - The collaborative, phased approach to design and construction, with risk mitigation and open-book pricing, will be maintained. **Summary** This RFI represents a substantial opportunity for firms with expertise in secure, complex, and innovative military construction and renovation. The projects at WPAFB are diverse in scope and scale, requiring advanced technical capabilities, robust cybersecurity practices, and a collaborative approach to design-build delivery. Interested contractors should carefully review the requirements and objectives, assess their alignment with the Government’s needs, and respond with detailed information on their qualifications, experience, and innovative solutions. For full details and updates, refer to the official notice at [SAM.gov Opportunity ID: f2756ddd0e984cc19099220bfce9e686](https://sam.gov/opp/f2756ddd0e984cc19099220bfce9e686/view).