GAOA Tony Grove Dam Spillway Capacity & Seismic Mitigation, Uinta/Wasatch/Cache National Forest
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
USDA-FS, CSA NORTHWEST 6
Contract Value
Not provided
Codes & Classification
Solicitation Number
1240BH27Q0002
NAICS
237990 - Other Heavy and Civil Engineering Construction
Classification Code
Y1KA
Additional Details
The United States Department of Agriculture (USDA) Forest Service, through its CSA Northwest 6 office, has issued a combined synopsis/solicitation (Solicitation No. 1240BH27Q0002) for the Tony Grove Dam Spillway Capacity & Seismic Mitigation project, located within the Uinta/Wasatch/Cache National Forest near Garden City, Utah. This procurement seeks qualified contractors to undertake significant reconstruction and enhancement of the Tony Grove Dam, with the primary objectives of increasing spillway capacity and improving seismic resilience.
The scope of work encompasses the reconstruction of specific portions of the dam as detailed in the provided drawings and technical specifications. Key project elements include the replacement of the dam’s outlet works, raising the dam crest, and the addition of embankment material to ensure structural integrity and compliance with current safety standards. The intended outcome is to enhance the dam’s ability to manage water flow during high-capacity events and to mitigate risks associated with seismic activity, thereby safeguarding both the local environment and downstream communities.
This solicitation is issued as a Request for Quotation (RFQ) in accordance with FAR Part 12 procedures for commercial construction. It is a total small business set-aside under the North American Industry Classification System (NAICS) code 237990, which pertains to Other Heavy and Civil Engineering Construction. The applicable small business size standard is $45 million in average annual receipts. Only small business concerns are eligible to submit quotations, and all responsible sources meeting these criteria will be considered.
The place of performance for this project is Garden City, Utah. The contract will be administered by the USDA Forest Service, with primary and secondary points of contact provided for inquiries: Judith Martin ([email protected]) and Janet Paul ([email protected], 541-750-7120). The procurement is currently active, with the response deadline set for December 15, 2026, following two amendments that extended the original due date.
Contractors interested in this opportunity should review all attached documents and specifications available via the official SAM.gov posting (Opportunity ID: 1763315dd04a411ba89819d656bc2fcf). The project is classified under Product Service Code Y1KA, indicating construction of dams, and is subject to all applicable federal acquisition regulations and small business set-aside requirements. No separate written solicitation will be issued beyond this combined synopsis/solicitation.
This opportunity is well-suited for contractors with demonstrated experience in heavy civil construction, particularly those with expertise in dam reconstruction, spillway upgrades, and seismic mitigation measures. The project’s requirements and deliverables are expected to remain consistent throughout the contract lifecycle, focusing on the safe and effective enhancement of the Tony Grove Dam’s capacity and resilience.
Documents7