Awtp-(2) 1000 Hp Reservoir Vertical Turbine

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

Macon Water Authority

Contract Value

Not provided

Codes & Classification
Solicitation Number

PE-33561-NONST-2027-000000077

NAICS

-

Classification Code

-

Additional Details
Set Aside

None

Place of Performance

GA

SourceSLED
Documents3
The Macon Water Authority, located in Macon, Georgia, has issued an Invitation to Bid for a significant infrastructure project at the Amerson Water Treatment Plant (AWTP) Reservoir Pump Station. This procurement seeks qualified contractors to furnish all necessary materials, labor, equipment, tools, and appurtenances for the installation (replacement) of two (2) 1000 horsepower (HP) vertical turbine motors. The project is designed to enhance the operational efficiency and reliability of the reservoir pump station, a critical component of the region’s water treatment and distribution system. The scope of work encompasses a comprehensive set of tasks, including the provision, installation, and precise laser alignment of the new motors. Contractors will be responsible for supplying a crane, removing and subsequently replacing the pump house roof to facilitate motor installation, and handling the removal and secure on-site storage of the existing motors. The project also requires the installation of provisions for vibration detectors—specifically, two detectors positioned 90 degrees apart with ¼-28 UNF tapped holes for sensor mounting. Additionally, contractors must provide and laser-align new couplings for each motor unit, manage all necessary electrical disconnections and reconnections, and install a vibration monitoring system, ensuring its proper operation. A critical aspect of the deliverables includes performing vibration analysis both before and after the installation of the new motors to verify system integrity and performance. All work must adhere strictly to the requirements and specifications detailed in the contract documents, ensuring a high standard of quality and compliance with the Authority’s operational needs. Participation in this procurement is contingent upon attendance at a mandatory pre-bid meeting, scheduled for November 3, 2026, at 10:00 A.M. at the Amerson Water Treatment Plant, 703 River Bend Road, Macon, GA. Bidders are required to attend the entirety of this meeting to be eligible for consideration. All questions regarding the bid must be submitted to the Owner by 10:00 A.M. on November 9, 2026. Sealed bids will be received at the Macon Water Authority’s Dorothy Black Training Room, 537 Hemlock Street, Macon, GA 31201, until 2:00 P.M. local time on November 17, 2026, at which time they will be publicly opened and read aloud. The Macon Water Authority, under the leadership of Executive Director & President Michel Wanna, reserves the right to reject any or all bids and to waive informalities and technicalities as deemed appropriate. This opportunity is classified under state procurement and is open to qualified contractors capable of meeting the technical and logistical demands of the project. For further details and access to the official solicitation documents, interested parties should refer to the Georgia Procurement Registry at the following URL: https://ssl.doas.state.ga.us/gpr//eventDetails?eSourceNumber=PE-33561-NONST-2027-000000077&sourceSystemType=gpr20. This project represents a substantial opportunity for contractors with expertise in large-scale pump station upgrades, heavy equipment installation, and precision alignment services, particularly those with experience in water treatment facility operations. The successful contractor will play a pivotal role in ensuring the continued reliability and efficiency of Macon’s water infrastructure.