Sources Sought / Market Intelligence: Multi-Projects for Army Reserve Program – Construction Management at Risk (CM@Risk) utilizing Other Transaction Authority (OTA)
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
W072 ENDIST LOUISVILLE
Contract Value
Not provided
Codes & Classification
Solicitation Number
W912QR-CMAR-ArmyReserveDevensSheridanPatton
NAICS
236220 - Commercial and Institutional Building Construction
Classification Code
-
Additional Details
Documents2
The U.S. Army Corps of Engineers (USACE), Louisville District, has issued a Request for Information (RFI) and Market Intelligence Notice to assess industry interest and capabilities for delivering multiple military construction (MILCON) and sustainment projects for the Army Reserve program. This market research effort is focused on the potential use of a Construction Management at Risk (CM@Risk) delivery model, executed under Other Transaction Authority (OTA) pursuant to 10 U.S.C. § 2808a. The notice is not a solicitation or request for proposals, but rather an opportunity for industry to inform the Government’s acquisition strategy and provide feedback on commercial best practices, technical capabilities, and innovative delivery approaches.
**Purpose and Scope**
The primary objective of this RFI is to gather comprehensive market intelligence regarding the feasibility and industry appetite for executing three distinct Army Reserve construction projects using the CM@Risk model under OTA. The Louisville District intends to award three separate, standalone OT agreements—one for each project—pending the results of this market research. The projects under consideration are:
1. **Collective Training Enlisted Barracks – Devens Reserve Forces Training Area (Devens AR), MA**
- Estimated Value: $35M–$45M
- Scope: Construction of a 46,000 SF, 300-soldier open-bay barracks with associated support spaces and site improvements, designed for a 40-year minimum life and incorporating DoD antiterrorism, sustainability, energy, and accessibility standards.
- Design Status: To reach 65% after survey and geotechnical work; CMAR entry anticipated at 65% or 95% design.
2. **Area Maintenance Support Activity (AMSA) Facility – Fort Sheridan, IL**
- Estimated Value: $30M–$40M
- Scope: Construction of a 19,000 SF AMSA shop with high-bay drive-thru, admin areas, and supporting facilities, including demolition of an existing 26,845 SF structure. The project will meet Army Reserve and Unified Facility Criteria, with a focus on industrial systems, security, and sustainability.
- Design Status: 65% complete; CMAR entry anticipated at 95% design.
3. **Airborne Equipment Parachute Repair Shop – Patton USARC, Bell, CA**
- Estimated Value: $5M–$15M
- Scope: Addition of a 1,500 SF parachute drying tower to an existing facility, supporting the 346th Quartermaster Company. The tower will accommodate 120 parachutes per cycle and include specialized access and environmental controls.
- Design Status: 65% anticipated by December 2026; CMAR entry anticipated at 95% design.
**Key Requirements and Objectives**
The Louisville District seeks to leverage the statutory flexibilities of OTA to test and implement emergent construction technologies, commercial practices, and alternative delivery models. The CM@Risk approach is intended to:
- Enhance mission resilience and accelerate project schedules.
- Foster improved collaboration between the Government, designer of record (DOR), and construction contractor.
- Increase cost transparency and enable open-book pricing.
- Allow for early contractor involvement in constructability reviews, value engineering, and supply chain risk mitigation.
The acquisition strategy contemplates a two-phase execution:
- **Phase 1 (Preconstruction Services):** The selected contractor will provide constructability reviews, value engineering, cost modeling, and scheduling support under a firm-fixed-price fee.
- **Phase 2 (Construction Execution, “At-Risk”):** Upon agreement of a Guaranteed Maximum Price (GMP), the contractor assumes responsibility for construction delivery, site logistics, and schedule compliance. If a GMP cannot be reached, the Government reserves the right to pursue alternative acquisition strategies.
**Contracting Entity and Contact Information**
- **Contracting Entity:** W072 ENDIST LOUISVILLE (USACE Louisville District)
- **Department:** Department of Defense, Department of the Army
- **NAICS Code:** 236220 – Commercial and Institutional Building Construction (2022)
- **Small Business Size Standard:** $45.0 Million (for market research purposes only; OTA is not subject to FAR-based set-aside requirements)
- **Primary Contact:** Anastasia Caldera, [email protected], 502-315-6988
**Procurement Type and Special Considerations**
This notice is a Sources Sought/Market Intelligence RFI and does not constitute a formal solicitation. The use of OTA under 10 U.S.C. § 2808a allows for significant flexibility in acquisition, including the ability to test new delivery models and commercial practices outside the constraints of the Federal Acquisition Regulation (FAR). There are no small business set-aside requirements for this effort, but the Government is interested in understanding the industrial base demographics and capabilities.
**Expected Deliverables and Industry Feedback**
Interested firms are invited to respond to a detailed questionnaire covering company profile, project interest, OTA experience, CM@Risk delivery preferences, technical capabilities, bonding capacity, and feedback on the proposed acquisition strategy. The Government is particularly interested in:
- Experience with military barracks, industrial maintenance facilities, and specialized climate-controlled shops.
- Perspectives on the optimal design maturity for CMAR entry and the benefits of early contractor involvement.
- Recommendations for evaluation criteria that differentiate high-performing collaborative builders.
- Suggestions for alternative acquisition strategies, phasing, or commercial practices that could improve outcomes.
**Submission Instructions**
Responses must be submitted via the designated online survey form (https://forms.osi.apps.mil/r/en56Ygym1f) by 11:00 AM Eastern Time on October 5, 2026. No other submission methods will be accepted. Firms are encouraged to join the Interested Vendors List on SAM.gov for future updates. All responses will be treated as public market research; proprietary or classified information should not be submitted.
**Constant Elements Over Contract Lifecycle**
- The projects are part of the Army Reserve’s MILCON and sustainment portfolio, managed by USACE Louisville District.
- The CM@Risk with OTA model is being evaluated for its potential to deliver enhanced value, collaboration, and schedule acceleration.
- The NAICS code and size standard are provided for market research; OTA is not subject to FAR-based set-aside rules.
- The Government seeks industry input to shape the final acquisition approach and maximize project success under 10 U.S.C. § 2808a.
For further information, contractors should refer to the official notice on SAM.gov (Opportunity ID: e94359f94e4544408eefdafc57ccf45a) or contact the primary point of contact listed above.