LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

W071 ENDIST OMAHA

Contract Value

Not provided

Codes & Classification
Solicitation Number

W9128F27BA007

NAICS

237990 - Other Heavy and Civil Engineering Construction

Classification Code

Y1PZ

Additional Details
Set Aside

SBA

Place of Performance

Big Bend, United States

SourcePIEE
The project is located along the left descending bank of Lake Sharpe near the Lower Brule, SD town site. Lower Brule North Element 2 includes a 100-foot-wide riparian planting bench, a gravel maintenance path along the entire reach, a riprap revetment to protect the shoreline and island from erosion, and the creation of a 200-by-1,500-foot island constructed in water up to three feet deep. The sheltered open water area between the island and the shoreline will develop into approximately 5.17 acres of emergent wetland, and this will also create approximately 32 acres of riparian habitat. Related tasks include earth moving, grading, bank shaping, rock installation, water management, fill, and topsoil placement.
Documents6