INDUSTRY DAY: Fort Carson Equipment Concentration Site - Construction Management at Risk using Other Transaction Authority (CM@Risk w/OTA)
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
W072 ENDIST LOUISVILLE
Contract Value
Not provided
Codes & Classification
Solicitation Number
W912QR-IndustryDay-FortCarsonECS-CMARwithOTA
NAICS
236220 - Commercial and Institutional Building Construction
Classification Code
Y1AZ
Additional Details
Documents5
The U.S. Army Corps of Engineers (USACE), Louisville District, has issued a Special Notice to inform industry of an upcoming procurement for the construction of a new Equipment Concentration Site (ECS) complex at Fort Carson, Colorado. This project will be executed using a Construction Manager at Risk (CM@Risk) delivery method under the authority of 10 USC §2808a, leveraging Other Transaction Authority (OTA) for construction. The notice serves as an advance announcement to facilitate industry awareness, planning, and feedback prior to the formal solicitation process.
**Purpose, Scope, and Intended Outcomes**
The primary objective of this procurement is to deliver a consolidated, state-of-the-art ECS complex on a 48-acre undeveloped parcel at Fort Carson. The facility will support ECS-42, which is tasked with the maintenance and storage of critical military equipment for 83 regional Army Reserve units. The operational readiness of these assets is vital for both training Army Reserve Soldiers and equipping units that provide essential warfighting capabilities to the Active component.
**Key Requirements, Objectives, and Expected Deliverables**
The project encompasses the design and construction of a comprehensive suite of facilities and supporting infrastructure, including:
- **General Purpose Warehouse (GPW):** A 39,313 SF secure, clear-span storage facility for military equipment.
- **Area Maintenance Support Activity (AMSA) Shop:** A 26,217 SF vehicle maintenance facility equipped with advanced exhaust systems, overhead cranes, heavy-duty hoists, and specialized tool rooms.
- **Organizational Storage Building:** A 5,000 SF high-bay vertical storage facility.
- **Container Storage Area:** A 4,440 SY reinforced concrete area for secure tactical container storage.
Supporting infrastructure and specialized systems will include:
- **Heavy Equipment Parking & Site Work:** Military Equipment Parking (MEP) lot with heavy-duty concrete pavements, POV parking, security fencing, and utility tie-ins.
- **Tactical Vehicle Wash Facilities:** Two high-capacity wash racks with industrial filtration and water-recycling systems.
- **Bi-Level Loading Ramp:** Reinforced ramp for efficient loading/unloading of heavy armored vehicles.
- **Specialized Foundations:** Deep foundation systems and soil stabilization to address challenging geotechnical conditions.
- **Fire Protection:** Advanced detection and suppression systems, including solutions for high-bay and hazardous material areas, compliant with UFC and NFPA standards.
- **Cybersecurity:** Facility-related control systems designed per UFC 4-010-06 to ensure cybersecurity of networked building systems.
- **UFC Compliance:** Full adherence to Unified Facilities Criteria, including Antiterrorism/Force Protection (AT/FP) and sustainable design per Army policy.
**Contracting Entity and Contact Information**
- **Contracting Entity:** W072 ENDIST LOUISVILLE (USACE Louisville District)
- **Department/Agency:** Department of Defense, Department of the Army
- **Primary Contact:** Chris Brackett, Email: [email protected], Phone: 502-315-6666
- **Physical Location:** Colorado Springs, Colorado (Fort Carson)
- **NAICS Code:** 236220 (Commercial and Institutional Building Construction)
- **Product Service Code:** Y1AZ
**Procurement Type, Set-Aside, and Special Considerations**
This procurement is classified as a Special Notice and is not set aside for any specific business category (Set-Aside Type: NONE). The acquisition will utilize a two-step, streamlined competitive selection process:
1. **Step 1 – Statement of Qualifications:** Interested firms will submit a qualifications package. The Government will down-select up to three of the most qualified firms.
2. **Step 2 – Pitch Presentations:** Down-selected firms will participate in live pitch meetings. One firm will be selected as the Construction Manager at Risk for negotiation and award of a Firm-Fixed-Price (FFP) agreement, initially for preconstruction services (Phase 1), with construction (Phase 2) to follow as a bilateral modification upon successful negotiation of a Guaranteed Maximum Price (GMP).
The project will be delivered under an Other Transaction (OT) framework, which may offer greater flexibility than traditional FAR-based contracts. The selected CMAR will collaborate closely with USACE and the Designer of Record throughout the design and construction phases.
**Industry Day and Participation Logistics**
An Industry Day is scheduled for 06 October 2026 at 0900 Mountain Time at Butts Army Airfield Hangar, 9620 Son Tay Road, Fort Carson, Colorado. The event will provide an overview of the project, acquisition strategy, and anticipated requirements, and will allow for questions and feedback from interested parties. Both in-person and virtual participation (via Microsoft Teams) are available. Registration and access requirements are detailed in the notice, including REAL ID compliance and procedures for installation access.
**Constant Elements Over Contract Lifecycle**
- The project will remain under the oversight of USACE Louisville District.
- The scope will consistently focus on delivering a fully functional ECS complex with all specified core and supporting facilities.
- Compliance with UFC, AT/FP, cybersecurity, and sustainable design standards will be mandatory throughout.
- The CM@Risk with OTA procurement approach and the two-phase selection/award process will govern contractor engagement.
- The place of performance will remain Fort Carson, Colorado.
**Summary for Contractors**
This opportunity is well-suited for firms with demonstrated experience in large-scale, complex military construction projects, particularly those familiar with the CM@Risk delivery method and the unique requirements of Department of Defense facilities. The project’s scope, technical complexity, and compliance requirements necessitate robust capabilities in design-build collaboration, advanced construction techniques, and integrated project delivery. Interested contractors should monitor the official solicitation for further details and submission instructions, and are encouraged to participate in the Industry Day to gain deeper insight into the project and procurement process.
For more information and updates, refer to the official notice at: https://sam.gov/opp/351fd0d0842f411fadbe22471214399a/view