CO NP BLCA 10(1) South Rim Drive

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

6982AF CENTRAL FEDERAL LANDS DIVISI

Contract Value

Not provided

Codes & Classification
Solicitation Number

6982AF26Q000022

NAICS

237310 - Highway, Street, and Bridge Construction

Classification Code

Y1LB

Additional Details
Set Aside

SBA

Place of Performance

Montrose, Colorado, UNITED STATES

SourceSAM
The Federal Highway Administration, under the Department of Transportation, has issued a combined synopsis/solicitation for the South Rim Drive Improvement project (Project Number: CO NP BLCA 10(1)) in Montrose, Colorado. This procurement seeks qualified contractors to address urgent roadside safety concerns along South Rim Drive within the Black Canyon of the Gunnison National Park, following damage caused by a wildfire event in the previous year. The primary objective of this project is to restore and enhance roadside protection by removing hazardous remnants and installing modern, crash-tested safety barriers. The scope of work encompasses guardrail removal, site preparation, and installation activities across twelve distinct locations along the corridor. Contractors are expected to provide all necessary labor, materials, equipment, and supervision to complete the following principal tasks: - Selective Boulder Removal & Dispersal: Contractors must carefully remove, relocate, or safely set aside existing large boulder barriers at specified curves, ensuring compliance with park cultural and aesthetic guidelines. - Site Grading & Base Preparation: Minor grading, shoulder stabilization, and post-hole excavation are required at each designated site to prepare for barrier placement. - Specialized Guardrail Procurement & Installation: The project calls for the supply and installation of steel guardrail systems featuring a weathered-look finish and structural treatments, such as Natina stain coatings, to meet both safety and aesthetic requirements. - Traffic Control & Sequencing: Comprehensive traffic control measures, including active one-lane closures and flagging operations, must be implemented to ensure the safety of park staff and visitors during construction. A notable requirement is the extended procurement window for the specialized weathered-look guardrail steel and associated coatings, which may involve up to an eight-week lead time plus material curing periods. The contract schedule and ordering timelines are structured to accommodate these supply chain constraints. Construction operations are anticipated to commence in early Spring (April), leveraging full road closure windows prior to the seasonal opening and transitioning to active one-lane traffic control as the roadway opens to the public. The anticipated schedule is as follows: - Advertisement: Mid-September 15, 2026 - Award: Mid-October 2026 - Notice to Proceed: Mid-October 2026 (enabling immediate guardrail ordering) - Construction: Early April 2027 through Late May 2027 The estimated bid range for Schedule A is between $700,000 and $2,000,000. This opportunity is classified under NAICS Code 237310 (Highway, Street, and Bridge Construction, 2022 version) and Product Service Code Y1LB. The procurement is set aside for SBA-qualified contractors, indicating a preference for small business participation. The place of performance is Montrose, Colorado, within the United States. The contracting entity is the Central Federal Lands Division (Entity Organization Key: 100173515), a federal office under the Federal Highway Administration. Interested parties may direct inquiries to Denise Martinez or Jorey Deml at [email protected]. The solicitation is active, with a response deadline of August 10, 2026. Plans and specifications are available for review, and prospective bidders should carefully consider the specialized material requirements, supply chain timelines, and operational constraints associated with high-altitude weather and park visitor traffic. For further details and access to attachments, contractors are encouraged to visit the official notice at https://sam.gov/opp/22ad1a2e8b3f43029f96bc109801cdc9/view. This project represents a significant opportunity for contractors experienced in highway and roadside safety construction, particularly those capable of meeting aesthetic and cultural requirements within a national park setting and managing complex logistics and traffic control in a high-visibility public environment.
Documents8