Freedom Connection Natural Gas Pipeline

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

W2SR ENDIST CARIBBEAN(PROVIS)

Contract Value

Not provided

Codes & Classification
Solicitation Number

W51DQV26Z1BHC

NAICS

237120 - Oil and Gas Pipeline and Related Structures Construction

Classification Code

Y1NA

Additional Details
Set Aside

NONE

Place of Performance

San Juan, Puerto Rico, UNITED STATES

SourceSAM
Documents1
The U.S. Army Corps of Engineers (USACE), Latin America and Caribbean District (SAA), has issued a Special Notice as part of its ongoing market research for the Freedom Connection Natural Gas Pipeline project in San Juan, Puerto Rico. This notice, identified by procurement number W51DQV26Z1BHC, is a Request for Information (RFI) and is not a solicitation for proposals or bids. Its primary purpose is to gather industry input to inform the final procurement strategy for a significant infrastructure initiative aimed at enhancing the resilience of Puerto Rico’s northern power grid. **Project Purpose and Scope** Funded by the U.S. Department of Energy (DOE), the Freedom Connection Project seeks to improve fuel infrastructure by constructing a new natural gas pipeline. The planned pipeline will span approximately 4.2 miles with a 20-inch diameter, connecting the existing San Juan LNG terminal to the Palo Seco Power Plant. The anticipated procurement will be a single design-bid-build contract, governed by Federal Acquisition Regulation (FAR) Parts 15 and 36. The estimated construction value ranges from $25 million to $100 million, with a performance period of 365 calendar days from Notice to Proceed (NTP). The expected award date is in the second quarter of Fiscal Year 2027. **Key Requirements and Expected Deliverables** The scope of work encompasses all integrated procurement, labor, equipment, and services necessary to construct and commission the pipeline in accordance with a forthcoming final engineering design. Core responsibilities include: - **Materials Procurement:** Acquisition of all required materials, including long-lead items such as 20-inch steel pipe, valves, fittings, and instrumentation, ensuring compliance with industry standards and the final design. - **Site Work:** Preparation of access roads and rights-of-way, site clearing, grading, and stabilization. - **Pipeline Installation:** Execution of installation activities using both trenchless methods (e.g., Horizontal Directional Drilling) and open trench cut-and-cover techniques, pre-fabrication, welding, non-destructive testing, inspection, application of protective coatings, and above-grade installation potentially involving deep concrete piles. - **Facilities Construction:** Construction of standalone facilities such as mainline block-valve stations and pig launcher/receiver stations, including associated electrical and instrumentation work. - **Delegated Design:** Management and execution of any delegated design elements (e.g., temporary works, trench shoring, specialized drill profiles, structural supports), with coordination and certification by licensed Professional Engineers. - **Testing and Commissioning:** Conducting hydrostatic pressure testing, leak detection, and all pre-startup commissioning protocols. - **Restoration and Handover:** Restoration of all disturbed areas and formal transfer of the completed pipeline and facilities to the owner/operator. **Contracting Entity and Location** The contracting entity is W2SR ENDIST CARIBBEAN(PROVIS), a federal office under the Department of Defense, specifically the Department of the Army. The place of performance is San Juan, Puerto Rico (PR), United States. The project is classified under NAICS Code 237120 (Oil and Gas Pipeline and Related Structures Construction), with a small business size standard of $45 million. The Product Service Code is Y1NA. **Procurement Type and Set-Aside Considerations** This notice is strictly for market research and does not constitute a set-aside for any particular business category. However, USACE-SAA is particularly interested in responses from Small Business concerns, including certified HUBZone, 8(a), Woman-Owned Small Businesses, Economically Disadvantaged Woman-Owned Small Businesses, Service-Disabled Veteran-Owned Businesses, and Veteran-Owned Small Businesses. The information collected will help determine the final acquisition strategy, including any potential set-aside requirements. **Submission Instructions and Contact Information** Interested firms are requested to submit a capability statement (maximum 10 pages) demonstrating their ability to manage and execute the integrated procurement and construction project. Submissions should include: - Company profile (name, address, POC, CAGE Code, UEI) - Business category and socioeconomic status - Bonding capacity documentation - Up to three relevant project examples as prime contractor, including references and details on scope, timeline, dollar value, and customer name Responses must be submitted via email by 10:00 AM (AST) on Thursday, 8 October 2026. No hardcopy or facsimile submissions will be accepted. Commercial brochures or existing marketing materials may also be included. Primary contact for this notice is Angel J. Martinez ([email protected], (939) 348-9503), with secondary contact M. Renee Booth ([email protected], (939) 348-9830). **Constant Elements Throughout the Contract Lifecycle** The project’s fundamental objectives—to enhance Puerto Rico’s power grid resilience through improved fuel infrastructure—will remain unchanged. The scope of work, performance location, NAICS classification, and the requirement for comprehensive procurement and construction services are core elements that will persist throughout the contract lifecycle. The contracting entity and primary points of contact are also expected to remain consistent. **Additional Information** This notice is active and available for review on SAM.gov (Opportunity ID: ef820c00a61948cbba03afd48f419914). Interested contractors are encouraged to review the full notice and attachments for further details. In summary, this opportunity represents a substantial infrastructure project with a focus on integrated procurement and construction of a natural gas pipeline in Puerto Rico. Firms with relevant experience in pipeline construction, trenchless technologies, and complex civil works in urban or environmentally sensitive areas are encouraged to respond, particularly those qualifying under small business categories.