Belle Fountain Ditch Cleanout Phase 2

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

W07V ENDIST MEMPHIS

Contract Value

Not provided

Codes & Classification
Solicitation Number

W912EQ26BA002

NAICS

237990 - Other Heavy and Civil Engineering Construction

Classification Code

Z1PC

Additional Details
Set Aside

SDVOSBC

Place of Performance

Pemiscot County, Missouri, United States

SourcePIEE
Documents4
Title of Work: Belle Fountain Ditch Cleanout Phase 2 Project Description: The work consists of furnishing all plant, labor, and materials for channel cleanout of Belle Fountain Ditch region including Bypass of Steele and Main Ditch according to the plans and specifications and any incidental related work. The project limits are starting at the confluence of New Franklin Ditch and Bypass of Steele, heading North through Bypass of Steele and it turns into Main Ditch, and ending at the intersection of Main Ditch and County Rd. 442 located approximately 2.5 miles south of Braggadocio, Missouri as shown on the plans. Work Location: The work shall be located at Bypass of Steele where it intersects with New Franklin ditch, then heads north through Main Ditch, and ends 100 ft before the intersection of Main Ditch and County Rd. 442, approximately as indicated. The North American Industry Classification System code is 237990 - Other Heavy and Civil Engineering Construction, with a Small Business Size Standard of $45M. This project is advertised as a Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside using sealed bid procedures. Amendment 0001 has been posted. Amendment 0002 has been posted.