Sources Sought/RFI - AFLCMC/ESAN FMS Brazil Radar Modernization
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
FA2330 ARSPC MGNT SYSTMS AFLCMC/HBA
Contract Value
Not provided
Codes & Classification
Solicitation Number
A068794
NAICS
334511 - Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
Classification Code
5840
Additional Details
Documents1
The Department of the Air Force, through the Aerospace Management Foreign Military Sales (FMS) Branch (AFLCMC/ESAN), has issued a Sources Sought/Request for Information (RFI) notice to gather market intelligence and identify potential commercial solutions for the modernization of Ground Control Approach (GCA) and Precision Approach Radar (PAR) systems. This initiative is primarily aimed at supporting the Brazilian Air Force, with the possibility of extending to other FMS partner nations. The notice is not a solicitation for proposals but serves as a preliminary step to inform future acquisition strategies, statements of work, and performance specifications.
**Purpose and Scope**
The overarching goal of this procurement activity is to replace the existing L3Harris GCA-2000 and PAR-2000 systems with highly mobile, production-ready, and commercially available radar solutions. The modernization effort seeks to enhance the Brazilian Air Force’s capabilities in radar surveillance and precision landing operations, thereby improving operational effectiveness and safety. The scope of the anticipated contract includes the delivery of all required radar equipment, initial spares, site modifications, and comprehensive system integration.
**Key Requirements and Objectives**
The Government has outlined a detailed set of technical and operational requirements that prospective solutions must address:
- **Certification:** Systems must be capable of achieving full flight inspection certification in accordance with FAA/ICAO standards for both Airport Surveillance Radar (ASR) and Precision Approach Radar (PAR) functions.
- **Mobility and Deployment:** Solutions should be transportable by KC-390 aircraft, with a threshold setup time of 8 hours by 4 personnel (objective: 4 hours by 2 personnel, roll-on/roll-off capable with minimal disassembly).
- **Surveillance Capabilities:**
- Primary Surveillance Radar (PSR) with a minimum range of 30 NM and altitude coverage up to 10,000 ft AGL (objective: 60 NM and 18,000 ft).
- Secondary Surveillance Radar (SSR) with a minimum range of 60 NM and altitude coverage up to 18,000 ft AGL (objective: 100 NM and 35,000 ft).
- Support for ATCRBS, Modes 3/A, C, S, and ADS-B (objective: native cryptographic integration for secure military Mode 5).
- High probability of detection for both PSR and SSR.
- **Precision Landing:**
- PAR capable of servicing at least 6 runways, switchable within 60 seconds (objective: more than 6 runways, switchable in under 30 seconds).
- Reliable tracking and detection out to 10 NM (objective: 20 NM or greater).
- Ability to track up to 50 aircraft in azimuth and 22 in elevation (objective: over 100 combined).
- High detection probability and improved resolution and accuracy.
- **Communications and Interoperability:**
- Output in standard ASTERIX Eurocontrol data format.
- At least two ATC positions with UHF/VHF transmit/receive capability and guard frequency monitoring (objective: modular expansion up to six positions and secure, encrypted communications).
- **Reliability and Maintainability:**
- System redundancy, backup power, and a mean time between critical failure (MTBCF) greater than 2,000 hours.
- Mean time to repair (MTTR) less than 30 minutes (objective: less than 15 minutes).
- **Certifications:**
- Systems should identify compliance with operational certifications, including ATCRBS IFF Mark XII (AIMS), cybersecurity, interoperability, NAS, spectrum, and transportability.
- **Ancillary and Support Equipment:**
- Identification of all necessary generators, ECUs, hardware/software, and ancillary equipment for standalone operation (objective: integrated, self-contained auxiliary systems).
- **Maintenance and Support:**
- Provision of operator and maintenance manuals, training courses, and long-term sustainment mechanisms.
- Worldwide logistics support is highly desired, with clear identification of size, weight, power constraints, and depot/sustainment mechanisms.
**Contracting Entity and Location**
The contracting activity is managed by FA2330 ARSPC MGNT SYSTMS AFLCMC/HBA, a federal office under the Department of the Air Force, located at Hanscom Air Force Base, Massachusetts, USA.
**Classification Codes**
- **NAICS Code:** 334511 – Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
- **Product Service Code:** 5840
**Procurement Type and Special Considerations**
This notice is a Sources Sought/RFI and does not constitute a formal solicitation or a commitment to issue a Request for Proposal (RFP) in the future. There are no set-aside requirements specified at this stage; however, respondents are encouraged to indicate their small business status and participation in socio-economic programs (e.g., small disadvantaged, women-owned, HUBZone, service-disabled veteran-owned).
All responses are voluntary and will be used strictly for market research and planning purposes. The Government will not reimburse any costs associated with responding to this notice. Submissions should be unclassified, in PDF format, and not exceed 20 single-spaced pages.
**Submission Instructions and Contact Information**
Interested parties are requested to submit their responses by October 8, 2026. Submissions should address the ability to meet the outlined requirements and respond to capability assessment questions. The following business contact information should be included in a cover letter: company name and address, CAGE code, point of contact (POC) name, telephone number, and email address.
Primary contacts for this notice are:
- Ms. Kelsey Ribeiro, Contracting Officer ([email protected])
- Ms. Marilyn Hockersmith, Contract Specialist ([email protected])
- Ms. Cynthia Canavan, Program Manager ([email protected])
**Constant Elements Over Contract Lifecycle**
The core requirements for system performance, mobility, certification, reliability, and supportability will remain central throughout the contract lifecycle. The focus on interoperability, maintainability, and worldwide support reflects enduring priorities for the program and its FMS partners.
**Conclusion**
This Sources Sought/RFI represents an opportunity for qualified contractors with experience in advanced radar and air traffic control systems to inform the Air Force’s acquisition strategy for a critical modernization effort. Contractors with relevant capabilities, proven past performance, and the ability to deliver robust, certifiable, and supportable solutions are encouraged to respond and help shape the future requirements for this international defense partnership.
For further details and to access the official notice, visit: [SAM.gov Opportunity](https://sam.gov/opp/0e20ae1a1a1444c2b8858b3261a98ac4/view).