Airfield Electrical and Pavement Rehabilitation Upgrades_Moses Lake Auxiliary Field

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

W071 ENDIST SEATTLE

Contract Value

Not provided

Codes & Classification
Solicitation Number

W912DW26X1CHY

NAICS

237310 - Highway, Street, and Bridge Construction

Classification Code

Y1BD

Additional Details
Set Aside

None

Place of Performance

Washington, UNITED STATES

SourceSAM
The U.S. Army Corps of Engineers (USACE), Seattle District, is conducting market research through a Sources Sought notice to identify qualified contractors for an upcoming airfield electrical and pavement rehabilitation project at the Moses Lake Auxiliary Field, located at Grant County International Airport (GCIA) in Moses Lake, Washington. This initiative is managed by the Special Projects Branch at Joint Base Lewis-McChord (JBLM), WA, and is intended to inform the acquisition strategy for a future Request for Proposal (RFP). No contract will be awarded as a result of this notice; rather, it seeks to gauge industry interest, technical capability, and to solicit feedback on the feasibility of the proposed schedule and requirements. **Purpose and Scope** The primary objective of this procurement is to execute comprehensive maintenance and rehabilitation (M&R) of airfield pavements and critical electrical systems on Runway 09/27 and Taxiway Foxtrot. The Moses Lake Auxiliary Field supports active U.S. Air Force operations, making the reliability and safety of its infrastructure paramount. The anticipated contract, valued at over $10 million, will be solicited under NAICS code 237310 (Highway, Street, and Bridge Construction), with Product Service Code Y1BD (Construction of Airfield Runways and Taxiways). **Key Requirements and Deliverables** The scope of work encompasses three core components: 1. **Pavement Rehabilitation:** This includes demolition, grading, and re-paving of both Asphaltic Concrete (AC) and Portland Cement Concrete (PCC) surfaces, as well as crack repairs, joint sealing, and spall/patching repairs. 2. **Airfield Lighting Upgrades:** Work involves installing new in-pavement light fixtures, augering for light base locations, setting cans, pouring rapid-set concrete collars, laying new distribution paths, and pulling new #8 5kV conductors. 3. **Vault Equipment Upgrades:** The project requires a complete overhaul of the remote military operations runway vault equipment, including the installation of new Constant Current Regulators (CCRs), airfield lighting control and monitoring system (ALCMS) panels, and integration of Pilot Controlled Lighting (PCL) systems. **Schedule and Phasing Constraints** A significant challenge is the strict operational schedule designed to minimize disruption to both military and commercial airfield operations. The Statement of Work (SOW) will require: - A maximum airfield closure window of 60 calendar days, to occur between April 1st and September 30th within a single construction season, including final cleanup and turnover. - Phase 1 (West Taxiway F) and Phase 2 (East Taxiway F) must each be completed within a 14-to-21-day window to minimize closures of adjacent active commercial runways. - Standard working hours are Monday through Friday, 7:00 a.m. to 4:00 p.m., with the possibility of 24/7 operations and overtime upon pre-approval and coordination with GCIA and the Contracting Officer’s Representative (COR). The government has outlined a tentative 58-day schedule for the electrical upgrades, broken into seven phases ranging from demolition and make-safe activities to system commissioning and turnover. **Crew and Staffing Estimates** The government’s planning assumes three specialized crews: - Airfield Electrical Crew (6 personnel): Responsible for field demolition, conduit laying, cable pulling, and setting light bases. - Vault & Controls Crew (3 personnel): Focused on vault regulators, ALCMS, and system commissioning. - Targeted Concrete/Civil Crew (4 personnel): Handles on-site batch plant operations, ductbank encasements, pull can pads, light can grouting, and joint sealing. **Contracting Entity and Contact Information** The contracting entity is the Seattle District of the U.S. Army Corps of Engineers (W071 ENDIST SEATTLE), a federal office under the Department of the Army, Department of Defense. The primary point of contact for this notice is Mr. Robert Blair ([email protected]), with Ms. Shannan Jones ([email protected]) as the secondary contact. **Procurement Type and Set-Aside Considerations** This is a market research (Sources Sought) notice, not a solicitation. Both large and small businesses are encouraged to respond. If sufficient qualified small businesses express interest and capability, the government may consider setting aside the procurement for small business participation. For NAICS 237310, a small business is defined as having average annual gross revenues not exceeding $45 million over the past three fiscal years. **Submission Requirements and Industry Feedback** Interested firms are asked to submit a response (maximum five pages) including company information, a capabilities narrative, and up to three relevant project examples. Additionally, the government seeks industry feedback on the feasibility of the 60-day closure window and whether electrical upgrades should be included in the same contract as pavement work or separated. **Constant Elements** Throughout the contract lifecycle, the following elements will remain constant: - The project’s location at Moses Lake Auxiliary Field, Grant County International Airport, WA. - The focus on airfield pavement and electrical system rehabilitation to support military operations. - The requirement for strict adherence to operational constraints and phasing to minimize airfield disruption. - The use of NAICS code 237310 and PSC Y1BD. - The contracting authority and points of contact within the USACE Seattle District. **Conclusion** This opportunity is well-suited for contractors with demonstrated experience in large-scale airfield pavement and electrical system upgrades, particularly those familiar with the operational constraints of active military and commercial airfields. Firms with the requisite technical expertise, staffing capacity, and ability to meet aggressive scheduling requirements are encouraged to respond and provide critical feedback to help shape the final solicitation. For further details and to submit responses, interested parties should contact Mr. Robert Blair at [email protected], referencing “Sources Sought_Firm Name_ (CE0869) Rpr Moses Lake Runway” in the subject line. All correspondence must be via email; phone calls will not be accepted.