Selkirk to Surf Road Maintenance

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

USDA-FS, CSA INTERMOUNTAIN 8

Contract Value

Not provided

Codes & Classification
Solicitation Number

1240LT26Q0115

NAICS

237310 - Highway, Street, and Bridge Construction

Classification Code

Z2LB

Additional Details
Set Aside

SBA

Place of Performance

Wenatchee, Washington, UNITED STATES

SourceSAM
The United States Department of Agriculture (USDA) Forest Service, through its Intermountain 8 Contracting Office, has issued a combined synopsis/solicitation (Solicitation No. 1240LT26Q0115) for the "Selkirk to Surf Road Maintenance" project. This procurement seeks qualified small business contractors to provide commercial services aimed at improving infrastructure within the North Cascades Recreation Scenic Corridor, specifically in the Methow Valley Ranger District of the Okanogan-Wenatchee National Forest, Okanogan County, Washington. The primary objective of this project is to enhance the safety, accessibility, and overall visitor experience by performing maintenance and improvements on trails, bridges, campgrounds, and scenic viewpoints throughout the designated corridor. The scope of work encompasses a range of construction and maintenance activities, with a focus on the rehabilitation and upkeep of critical recreational infrastructure. The project area is accessible from Winthrop, WA, via SR-20 and Lost River Road, extending to key points such as Harts Pass Road (FSR 5400) and Slate Peak Road (FSR 5400600). This solicitation is issued as a Request for Quotation (RFQ) in accordance with FAR Part 12 for commercial items, and it represents the only solicitation for this requirement—no separate written solicitation will be provided. The procurement is a Total Small Business Set-Aside under NAICS code 237310 (Highway, Street, and Bridge Construction), with a small business size standard of $45 million. All responsible small business sources are encouraged to submit quotations, which will be evaluated by the agency. Key requirements and deliverables include, but are not limited to: - Maintenance and improvement of existing trails, bridges, campgrounds, and scenic viewpoints within the project area. - Adherence to all applicable federal, state, and local regulations and standards for construction and environmental protection. - Timely completion of work in accordance with the project schedule and specifications provided in the solicitation attachments. The place of performance is Wenatchee, Washington, with work specifically located within the Methow Valley Ranger District. Contractors should be prepared to mobilize resources and personnel to this region and demonstrate experience with similar projects in remote or environmentally sensitive areas. Interested parties must submit all questions regarding the solicitation via email to the Contract Specialist, Christopher Malley ([email protected]), no later than September 14, 2026, at 1:00 PM Pacific Time. Proposals must be submitted electronically to both [email protected] and [email protected] by the extended deadline of September 21, 2026, at 1:00 PM Pacific Time. For additional information or assistance, Tanya Spanfellner ([email protected], 208-258-1041) is available as a secondary point of contact. This opportunity is well-suited for small businesses with expertise in highway, street, and bridge construction, particularly those with experience in recreational or forested environments. Contractors should review all solicitation attachments available on the official SAM.gov posting (Opportunity ID: 7e689086fa0f48f7a7d8fa8c92d46c8c) to ensure a comprehensive understanding of the project requirements and submission procedures. In summary, the Selkirk to Surf Road Maintenance project represents a significant opportunity for small businesses to contribute to the enhancement of public lands and recreational infrastructure in the North Cascades region, supporting the USDA Forest Service’s mission to provide safe, accessible, and sustainable outdoor experiences.
Documents10