Z1DA--556-24-113 Oil Transformer and Switch Enclosure Upgrades

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

252-NETWORK CONTRACT OFFICE 12 (36C252)

Contract Value

Not provided

Codes & Classification
Solicitation Number

36C25226B0029_0001

NAICS

238210 - Electrical Contractors and Other Wiring Installation Contractors

Classification Code

Z1DA

Additional Details
Set Aside

VSA

Place of Performance

Illinois, UNITED STATES

SourceSAM
The Department of Veterans Affairs, through its 252-Network Contract Office 12, has issued a solicitation for the "Oil Transformer and Switch Enclosure Upgrades" project (Project Number: 556-24-113) at the Captain James A. Lovell Federal Health Care Center (FHCC), located at 3001 Green Bay Rd, North Chicago, Illinois. This procurement seeks qualified contractors under NAICS code 238210 (Electrical Contractors and Other Wiring Installation Contractors) to undertake a comprehensive renovation and upgrade of the facility’s medium voltage electrical infrastructure. The primary objective of this project is to replace aging medium voltage oil-filled transformers and associated switch enclosures serving multiple buildings across the FHCC campus (specifically buildings 1, 3, 9, 11, 66, 137, and 187). The scope includes the removal and replacement of four 150 KVA, two 300 KVA, and one 750 KVA transformers, with the additional requirement to relocate the 150 KVA transformer at building 3. The project also calls for the replacement of electrical distribution switchboards at buildings 137 and 3, as well as the installation of new concrete pads for transformers at buildings 9, 66, 187, and the new transformer location at building 3. To enhance site security and safety, anti-ram rated bollards are to be installed at all transformer locations. Contractors are expected to provide all necessary tools, materials, labor, quality assurance, and supervision to deliver a complete, compliant, and fully functional system. The project is designed to ensure compliant and safe conditions for ongoing maintenance of the facility’s electrical systems. A robust quality assurance and safety plan is required to minimize disruptions, prevent rework, and ensure timely completion. The anticipated period of performance is approximately 357 calendar days from the Notice to Proceed, with a detailed milestone schedule provided in the solicitation. Contractors are responsible for coordinating the procurement and delivery of long-lead equipment, optimizing the construction schedule to minimize field disruption and costs. The general contractor must submit a factory ship date commitment for critical equipment and adjust the baseline schedule accordingly. Key requirements include strict adherence to the project manual and drawing sets, as referenced in the solicitation. Prospective bidders are required to attend a single pre-bid conference to observe site conditions; however, no questions will be entertained during this event. All inquiries must be submitted as formal Requests for Information (RFIs) per the solicitation instructions, ensuring all bidders receive consistent information. This procurement is set aside under the VSA (Veteran-Owned Small Business Set-Aside) program, restricting competition to eligible veteran-owned small businesses. The contracting activity is managed by the Department of Veterans Affairs, with primary and secondary contacts provided for solicitation-related communications: Lynn H VanderVelde ([email protected]) and Demetrice Parker ([email protected]). Interested contractors should review all solicitation documents and attachments available via the official SAM.gov opportunity listing (Opportunity ID: b2357230e61442ce84fb9b5b31f2f980) and ensure compliance with all submission requirements by the stated response deadline. This project represents a significant opportunity for qualified electrical contractors with experience in medium voltage systems, transformer installation, and federal healthcare facility renovations.
Documents7