The Air Force Test Center (AFTC), Procurement Office PZZG, has issued a combined synopsis/solicitation (FA930226Q0110) for the modernization of the Electrical, Gas, and Water (EGW) control infrastructure at Building 1030, Edwards Air Force Base (EAFB), California. This procurement is being conducted as a sole source acquisition, with Trimax Systems, LLC identified as the only responsible source capable of fulfilling the requirement due to their proprietary ownership of the existing system’s Programmable Logic Controller (PLC) and Human-Machine Interface (HMI) source code.
**Purpose and Scope**
The primary objective of this procurement is to upgrade and modernize the EGW control system at Building 1030. The existing system, originally engineered and programmed by Trimax Systems, relies entirely on their proprietary PLC and HMI source code. The modernization effort is intended to enhance system reliability, maintain operational continuity, and ensure compliance with current cybersecurity standards, while avoiding the significant costs and mission downtime associated with a complete system replacement.
**Key Requirements and Deliverables**
The scope of work encompasses three main areas:
1. **System Engineering and Programming**
- **PLC Logic Development:** Engineering and programming of PLCs to control facility equipment such as pumps, valves, and generators, in accordance with approved operational sequences.
- **HMI/SCADA Configuration:** Development and deployment of HMI screens to provide operators with real-time status, historical data trending, and immediate alarming for critical faults.
- **Cybersecurity & Compliance:** All software and network integration must adhere to current Risk Management Framework (RMF) guidelines, including changing default passwords, disabling unnecessary ports, and implementing role-based access controls.
2. **Installation and Hardware Integration**
- **Panel Assembly:** Assembly, wiring, and labeling of all internal control panel components prior to delivery, with clear correspondence to schematic drawings.
- **On-Site Implementation:** Physical installation of upgraded components, termination of field wiring, and establishment of network connectivity, all performed to avoid uncoordinated disruptions to facility operations.
3. **Testing and Commissioning**
- **Site Acceptance Testing (SAT):** Comprehensive testing with government representatives, including loop checks, verification of automated sequences, and simulated fault testing.
- **System Cut-Over:** Management of the transition from the legacy system to the upgraded system, ensuring continuous utility support throughout the process.
**Contracting Entity and Location**
The contracting activity is managed by FA9302 AFTC PZZ, a federal office located at Edwards Air Force Base, California. The place of performance is Edwards, CA, United States.
**Classification and Procurement Details**
- **NAICS Code:** 541330 (Engineering Services)
- **Product Service Code:** R425
- **Procurement Type:** Combined Synopsis/Solicitation (Commercial Products and Services)
- **Set-Aside:** None (not set aside for small business concerns)
- **FOB:** Destination, Building 1030, EAFB
- **Period of Performance:** Estimated at 30 days
**Justification for Sole Source**
Trimax Systems, LLC retains proprietary rights to the PLC and HMI source code and related intellectual property. Market research, including a sources sought notice, confirmed that no other vendors possess or can legally obtain the necessary source code to perform the required upgrades without a complete system replacement. Such a replacement would result in duplicative costs estimated up to $500,000 and unacceptable mission delays due to prolonged utility shutdowns. Modifications by third parties could also compromise system functionality, cybersecurity, and future support.
**Contact Information**
- **Contract Specialist:** Carmen Barahona ([email protected])
- **Contracting Officer:** Karla Vazquez ([email protected])
**Additional Information**
Interested parties may submit capability statements, proposals, or quotations, which will be considered by the agency. However, the government’s determination to proceed with a sole source award is based on the unique technical requirements and proprietary nature of the existing system. The solicitation incorporates applicable provisions and clauses by reference, accessible at www.acquisition.gov. The response deadline for proposals is 12PM PDT on 24 August 2026.
This opportunity is best suited for contractors with direct access to Trimax’s proprietary source code and technical expertise in EGW control system integration, engineering, and cybersecurity compliance. The contract’s core requirements and technical constraints are expected to remain constant throughout its lifecycle, given the proprietary nature of the system and the need to maintain operational continuity at a critical government facility.