56--LOWER YELLOWSTONE RIVER BYPASS CANAL RIPRAP
Key Dates
Due Date
-
Posted Date
-
Agency & Value
Agency
GREAT PLAINS REGIONAL OFFICE
Contract Value
Not provided
Codes & Classification
Solicitation Number
140R6026Q0144
NAICS
212319 - Other Crushed and Broken Stone Mining and Quarrying
Classification Code
5610
Additional Details
The Bureau of Reclamation, operating under the Department of the Interior and represented by the Great Plains Regional Office, has issued an award notice for the procurement titled "LOWER YELLOWSTONE RIVER BYPASS CANAL RIPRAP." This initiative is focused on the supply of riprap material for the Lower Yellowstone River Bypass Canal, a critical infrastructure project aimed at enhancing canal stability and erosion control along the river corridor.
The scope of this procurement centers on the provision of crushed and broken stone, specifically riprap, which is essential for reinforcing canal banks and ensuring long-term durability against water flow and environmental factors. The requirement falls under NAICS Code 212319, "Other Crushed and Broken Stone Mining and Quarrying," indicating that the successful contractor must possess expertise in mining, processing, and delivering stone materials suitable for heavy civil works and water management applications. The associated Product Service Code is 5610, further specifying the need for construction-grade stone products.
The contracting entity is the Great Plains Regional Office, a federal office within the Bureau of Reclamation. The office is responsible for overseeing water resource management and infrastructure projects across the region. Contractors interested in this opportunity should note that the procurement is managed at the federal level, ensuring compliance with government standards and regulations throughout the contract lifecycle.
Key objectives of the project include the timely and efficient supply of riprap material that meets specified quality and sizing requirements, supporting the Bureau’s mission to maintain and improve water conveyance systems. Expected deliverables are the delivery of stone material to designated locations along the Lower Yellowstone River Bypass Canal, with adherence to technical specifications and environmental considerations as outlined by the Bureau.
The notice remains active, and while no attachments or additional documents are currently available, interested parties may seek further information or clarification by contacting Alicia Dunn, the primary point of contact for this procurement. Ms. Dunn can be reached via email at [email protected]. The notice and additional details can be accessed through the official SAM.gov opportunity page at https://sam.gov/opp/ed21faf139324794a38b159e77df1ffa/view.
Contractors evaluating this opportunity should ensure their capabilities align with the requirements for mining, processing, and delivering riprap material for federal water infrastructure projects. The procurement type and any set-aside requirements are not specified in the notice, so firms should monitor the SAM.gov listing for updates or additional instructions. The project’s focus on durable stone supply for canal reinforcement is a constant element throughout the contract, making it suitable for firms with proven experience in large-scale stone quarrying and supply for civil works.
Overall, this award notice represents a significant opportunity for qualified contractors to contribute to the maintenance and improvement of the Lower Yellowstone River Bypass Canal, supporting the Bureau of Reclamation’s ongoing commitment to water resource management and infrastructure resilience.