Fence & Defensive Barrier Installation for TSA at Milwaukee Mitchell International Airport (MKE)

Key Dates
Due Date

-

Posted Date

-

Agency & Value
Agency

WORKFORCE & ENTERPRISE OPERATIONS

Contract Value

Not provided

Codes & Classification
Solicitation Number

70T01026Q5900N003

NAICS

238990 - All Other Specialty Trade Contractors

Classification Code

Z2AZ

Additional Details
Set Aside

SBA

Place of Performance

Milwaukee, Wisconsin, UNITED STATES

SourceSAM
The Transportation Security Administration (TSA), under the Department of Homeland Security, has issued a combined synopsis/solicitation (RFQ No. 70T01026Q5900N003) for the installation of fencing and defensive barriers at the TSA’s explosive storage magazine located at Milwaukee Mitchell International Airport (MKE), Milwaukee, Wisconsin. This procurement is a critical component of TSA’s ongoing efforts to support its canine explosive detection program by ensuring the secure and compliant storage of explosive training aids. **Purpose and Scope** The primary objective of this procurement is to design and install a secure perimeter fence and defensive barrier system around the TSA’s explosives storage magazine at MKE. The project is necessitated by airport improvements and the need to maintain uninterrupted canine operations, which are essential for TSA’s mission readiness and security posture. The intended outcome is a robust, code-compliant, and operationally effective barrier that safeguards explosive materials, supports canine training, and meets all applicable federal, state, and local requirements. **Project Requirements and Deliverables** The scope of work is divided into three firm-fixed-price (FFP) contract line items (CLINs): - **CLIN 0001 – Phase I: Design** The contractor is responsible for conducting a comprehensive site survey, developing high-level design drawings, and preparing a draft project plan. The plan must detail the approach to meeting all Statement of Work (SOW) requirements, including a preliminary schedule, staffing, materials, equipment, quality control, risk mitigation, site access, safety protocols, and coordination with TSA and airport authorities. Notably, design drawings and site surveys do not require preparation or stamping by a Wisconsin-licensed engineer. - **CLIN 0002 – Phase II: Installation** This phase encompasses the physical installation of the fence and defensive barriers. Key technical requirements include: - Construction of a horseshoe-shaped dirt berm using HESCO-style or similar defensive barriers, with specified dimensions (10 feet high, 13 feet on one side, 3 feet thick), filled with compacted imported soils or sand (gravel and rock are not permitted due to safety concerns). - Installation of fencing, gates, barbed wire, and related security features. - Electrical work, including running lines approximately 180 feet from the canine kennel to a new utility pole and then to the magazine. All materials, equipment, and labor for electrical installation must be contractor-provided, and the contractor must verify existing conditions during the site survey. - Compliance with all applicable codes, airport authority requirements, and FAA notification/determination requirements for any overhead electrical work. - All fill materials for the defensive barriers must be supplied by the contractor. - **CLIN 0003 – Phase III: Project Closeout** This includes final inspection, punch list completion, site restoration, and submission of all required closeout documentation. The entire project must be completed within 120 calendar days after receipt of order (DARO). **Key Considerations and Compliance** - **Set-Aside and Classification:** This solicitation is a total small business set-aside under NAICS code 238990 (All Other Specialty Trade Contractors), with a size standard of $19.0 million. The Product Service Code (PSC) is Z2AZ (Repair or Alteration of Other Administrative Facilities and Service Buildings). - **Labor Standards:** The Davis-Bacon Act wage determination (WI20260001) applies to all on-site construction and installation work, while the Service Contract Act wage determination (No. 2015-4899) applies to non-construction support services. Contractors are responsible for proper employee classification and compliance with all applicable wage determinations. - **Insurance and Permitting:** Contractors must meet all insurance requirements as determined by Milwaukee County and the airport authority. Subcontractor insurance may support the filing but does not relieve the prime contractor of responsibility. There are no fees for Tenant Improvement Plan (TIP) application submissions, and insurance limits will be finalized upon TIP review. - **Site Access and Coordination:** Site visits are encouraged but not mandatory for quote submission. Contractors must coordinate closely with TSA and airport authorities for site access, safety, and operational continuity. The closest inhabited building is 150 feet from the magazine, and all defensive barriers are to be placed on the existing concrete pad. - **Submission and Evaluation:** Quotes must be submitted electronically by the specified deadline. The evaluation will be conducted on a Lowest Price Technically Acceptable (LPTA) basis. Technical submissions must clearly demonstrate a feasible approach to the SOW requirements. Only quotes rated “Acceptable” on technical factors will be considered for award. **Contracting Entity and Contact Information** - **Contracting Office:** Workforce & Enterprise Operations, Transportation Security Administration, Department of Homeland Security - **Primary Contact:** Michael A. Capovilla, [email protected], 571-227-5833 - **Secondary Contact:** Stephen Saraceno, [email protected] **Location and Period of Performance** - **Place of Performance:** Milwaukee Mitchell International Airport (MKE), 5300 S Howell Ave, Milwaukee, WI 53207, United States - **Performance Period:** 120 calendar days after receipt of order **Special Considerations** - The project is governed by a comprehensive set of FAR and HSAR clauses, including those related to construction wage rates, labor standards, DEI requirements, and biobased product reporting. - The Limitations on Subcontracting clause (FAR 52.219-14) does not apply, as the contract is below the simplified acquisition threshold. - No government-furnished equipment or property will be provided; all materials and equipment must be contractor-supplied. - The government reserves the right to require in-person attendance for key meetings if necessary, though virtual participation is generally permitted with qualified on-site representation. **Summary** This opportunity is well-suited for small businesses with demonstrated experience in specialty trade construction, particularly those familiar with secure facility fencing, defensive barrier installation, and airport operational environments. Contractors must be prepared to manage all aspects of design, installation, and closeout, including compliance with stringent labor standards, insurance, and permitting requirements. The project’s success is critical to TSA’s canine explosive detection mission and requires a contractor capable of delivering high-quality, timely, and compliant work in a secure and operationally sensitive setting. Interested parties should review the full solicitation and attachments via the official SAM.gov posting (Opportunity ID: 8fb2b521e1424a49866b93519bdc523f) and direct any questions or submissions to the designated TSA contacts.
Documents7